Loading…
Loading…
8,143 results • Best match
LAC-ADS-LAC ADS 2024-25 Sri Vijin M MLA-Kalliassery LAC-Kattakkulam Meenchal Bund Road in Cherukkunnu Gramapnchayath- General Civil Work(Re-Tender)
3.14:Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.
LAC-ADS-LAC ADS 2023-24 Sri Vijin M MLA-Kalliassery LAC-Kuruvat Valaam thottam Road in Ezhome Gramapnachayath-General Civil Work(Re-Tender)
3.4:Construction of Embankment with Material Obtained from Borrow Pits Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5
AMRUT-Retarring from soda company to PK 46 2 epost ch 0 000 0 115 (ward 8)-Sl.No.6 Puzhathi zonal-General Civil Work
75.5.5.B.2pb:Modified Penetration Macadam 75 mm thick using Bitumen S-65 - Packed Bitumen Rates Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse ...
GENERAL NAVA KERALA SADAS 2024 25 Project under Mavelikara LAC Improvements by Providing BM and BC to Charumoodu Chunakara Thiruvairoor Temple Kottamukku road from ch 0 000 to 4 450 work General Civil Work
3.13.1.B:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Ordinary soil - Mechanical Means - (Depth upto 3 m)
Construction of Pavements inside front garden from Building to Fountain and Banyan Tree areas at Gangotri Guest House
Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) at any lead & lift (a) With earth obtained from excavation of foundation.
New Construction of Sub Center Building (G+1) With Compound Wall, Electricity at Vastana Ta:Matar in Dist Kheda.
Civil Hospital Compound, Sector-12,