Loading…
Loading…
8,212 results • Best match
Proj No.683/27-Renovation of Nalantha junction Bakery lane Njanabharanam road in Nanthancodu ward
... Penetration Macadam 75 mm thick using Bitumen S-65 - Packed Bitumen Rates <br> Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse ...
Annual Plan-NGP_ 75/26-27 Renovation of Puthuparambil padi- LC padi Road-Ward -4
75.8.1:Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. Max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification (i) Nominal mix (1:2:4)
Repair/renovation work of 04 nos. canals in purola block of uttarkashi. (Knautar Khaladi Minor)
Construction of coolie walling including supply of all material, labour, T&P etc. required for proper completion of the work as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications)
Repairs, renovation and Periodical Services to Bldg No. 260 (F and A Section) inside CFA
S&F of Framed work such as grills, gratings, etc.. with ends of bars shouldered and/or riveted, or forged into spikes; framed guard bars; barred iron doors; ladders; framed balusters; walk ways; railings; framework of water tanks and similar work conforming to Fe.290.Gde-E-165 as directed.
Renovation Works of 12 Nos Toilets in Production Shop Floor of BHEL Factory at Ranipet
(DAT.47.1-CMT)_(D47) Carrying out miselleounus type of works (Viz, masonry, etc,) which are not quantifiable like chipping of floor, finishing the... plastering, dismantling of floor,for making pockets for machine foundation dismantling of brick work for enabling to fix exhaust fans, fixing of exhaust fan, dismantling, of IWCs, EWCs, ...
Proj No.680/27-Renovation of Museum Bains compound road and byelanes in Nanthancodu ward
... Penetration Macadam 75 mm thick using Bitumen S-65 - Packed Bitumen Rates <br> Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse ...