Loading…
Loading…
8,347 results • Best match
Annual Maintenance of Buildings-Renovation of Wash Rooms, Providing kitchen Cup boards and Installation of G.I. Sheet Roofing over the Kitchen at Bungalow No2 in the premises of A.P. BHavan, New Delhi
Renovation of Room No 506 508 and the corresponding area of Academic Block II Medical Lab at the 5th Floor for Establishment of NELS at All India Institute of Medical Science Kalyani
Renovation of Room No. 506 & 508 and the corresponding area of Academic Block-II (Medical Lab) at the 5th Floor for Establishment of NELS at All India Institute of Medical Science, Kalyani.
EOR to Central Jail-2, Tihar, New Delhi. (SH- Construction of Toilet Block for doctors in OPD/Dispensary and Renovation of existing common toilet in OPD/Dispensary in Central Jail No. 2).
EOR to Central Jail-2, Tihar, New Delhi. (SH: Construction of Toilet Block for doctors in OPD / Dispensary and Renovation of existing common toilet in OPD / Dispensary in Central Jail No. 2).
DEPOSIT -Chelakkara Group Village office-Plan Scheme 2024-2025- Renovation and extension of Chelakkara group village office for converting to smart village office in Thrissur district (Chelakkara L.A.C.)-Electrification-General Electrical Work
OD18302/2026-2027:Fabrication, supply & installation of dust and vermin proof, wall mounting, thermoplastic Syntex meter box of folowing size suitable for fixing 3 pase KSEB meter,fuse units, CT etc, hinged door construction for the front side with compartments if necessary, providing vision panel for the meter compartment, knock out for cable entry and exit. 430 x 215 x 155 (GBMB-4422)
RENOVATION AND FITTING-FIXING OF ONE NO. 750 MM DIA BUTTERFLY VALVE BY REPLACING WORN OUT SPARE PART WITH NEW ONES OF PUMP UNIT NO. 04 OF CWPS-IV , GARDEN REACH WATER WORKS.
DISMANTLING THE FILLOWING PDV/BFV FROM THE EXISTING PIPE-BAY, INSTALLATION/FITTING-FIXING OF BARREL-PIECE/ FLANGE AND LIFTING & KEEPING THE SAME ON THE WORKING PLATFORM SEQUENTIALLY AND CAUTIOUSLY AS PER DIRECTION OF THE EIC AT GRWW. B)750 MM DIA
SH-Renovation of Ground Floor Toilets of old building block to prevent seepage in the basement and partition work for shifting AYUSH Department in Acharya Shree Bhikshu Govt. Hospital, Moti Nagar, New Delhi.