Loading…
Loading…
8,614 results • Best match
Necessary repairing and renovation of 4 and 5th floor of HRBC Bhawan to accomadate office of the enquery Commission at Munshi Premchand Sarani,Kolkata-700021 during the year 2026-27-SITC of Intelligent Fire Detection System.
Supplying and fixing 20 mm PVC Rigid Conduit 'FR' [Precision Make] of following sizes on wall, ceiling with saddles and other accessories as required and mending good damages to building works [E-16/7(a)]
Renovation of Inspection Bungalow, Boundary Wall along with Drainage System by Constructing of Gully Pit and Catch Pit including supplying of Dewatering Pump at the premises of Digha Inspection Bungalow under Contai Division, Dist.- Purba Medinipur
Renovation of community hall located in areas predominantly inhabited by SC and ST, installation of racks to convert them into libraries and provision of library books and newspaper (at ward no Neralekere and Balageri comunity hall )
Renovation of community hall located in areas predominantly inhabited by SC and ST, installation of racks to convert them into libraries and provision of library books and newspaper (at ward no 16 and 17)
Renovation of Ladies and Gents and officers Toilets of all floors, GM(QS&S) section at second floor and legal section at ground floor and other allied works at Block II Building, corporate office, BESCOM, Bengaluru
Renovation of Ladies and Gents and officers Toilets of all floors, GM(QS&S) section at second floor and legal section at ground floor and other allied works at Block II Building, corporate office, BESCOM, Bengaluru
Some Additional works In connection with Renovation rewiring with fixing AC unit, computer board on desktop including LAN Line etc, in newly set up 11th. Floor.WBIFMS Development Centre of Finance Deptt. at Subhanna Building by Central ..
Supplying & Fixing 2 Module GI Modular Switch Board complete with top cover plate flushed in wall for housing the board after cutting the brick wall incl. making earthing attachment, painting and mending good damages to building works.
Rough Cost Estimate
[13.29.2]Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 2. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works [Through Rate]