Loading…
Loading…
92,999 results • Best match
Vamanapuram BP 2025-26 CONSTRUCTION OF TOILET IN PALUVALLI KAIRALI LIBRARY - ALLIED WORKS-Prj. No. 213/26, Nanniyode GP-General Civil Work
10.25.2:Item Shifted to Sub head 14 as item 14.73 Item Shifted to head 14 as item 14.74 Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
LAC ADS Bridge Neelamkonam Construction of bridge across RBC and allied leak prevention works near ch 14500m at Neelamkonam General Civil Work
OD5252/2025-2026:RING BUND- Putting up ring bund with earth fille cement bags of top width 1.0m bottom width 1.5m height 1.0 m side and filling in between with earth to form ring bund and maintaining the same leak proof till the completion of the work and clearing the site by dismantling the bund after completion of the work. etc. complete.
MPLADS-2025-26-Construction of a building for Anganvadi No.79 in ward-1 of Thodiyoor GP in Oachira BP-General Civil work
BUILDING
Repairing & Renovation work of PNB, Block No. 07, Creche Building and Block No. 1 at Temporary Campus at IGNOU Campus, Maidan Garhi, New Delhi (Civil & Electrical Works)
1 (Civil & Electrical Work) 9614195 Below 24.24 7283714.132
Civil Work
CIVIL WORK.
Construction of Branch Library Building at Kattankolathur in Chengalpattu District.
Supplying and fixing in position best quality PVC soil / waste pipes of various dia having 6 kg / sq.cm. pressure BIS mark and providing leak proof joints using PVC adhesives including fixing to the wall with special PVC / MS clamp, teak wood plugs, brass screws, etc., and making connection to all sanitary fittings, dismantling masonry / RCC works wherever found necessary and making the good dismantled portion to the original condition, including testing for any leakages, etc., complete complying with standard specifications. (The PVC pipes should be got approved by the Executive Engineer before use on works). The rate for earth work excavation will be measured and paid separately in the cases where the pipe lines are proposed to laid below ground level