Loading…
Loading…
92,949 results • Best match
RCC Framed Structure
OD188330/2023-2024:Providing and laying in position machine batched and machine mixed design mix M-30 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 340 kg/ cum. Excess/less cost of cement as per mix design is not payable or not recoverable. All works up to plinth level.
Refer to BOQ
Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. Welded
CIVIL WORK- CONSTRUCTION OF CC ROAD FROM ARUN SAHU TO PITCH ROAD
eProcurement System of Government of West Bengal Created By: SHYAM MISHRA Created Date/Time: 08-Dec-2025 09:58 AM Tender Title: CIVIL WORK- CONSTRUCTION OF CC ROAD FROM ARUN SAHU TO PITCH ROAD Tender ID: 2025_ZPHD_937656_3
GENERAL-Premonsoon work 2026-27 Ordinary repairs to Various bridges under North Paravur bridges Section-General Civil Work
Work Name:GENERAL-Premonsoon work 2026-27-Ordinary repairs to Various bridges under North Paravur bridges Section-General Civil Work
Special repair works by providing chemical treatment to RCC members viz , column and beam and carrying out allied civil works of Officers Quarters building at Saibaba Marg Parel Under Section 353-B of MMC Act 1888
1 *Providing & erecting sturdy steel H- frame scaffolding at any height, making proper platforms at required levels to work on & for debris collecting, covering entire surface with jute kantan including necessary supports etc. for the entire duration of the works including dismantling & taking away on completion of work from the site etc. complete. 1215 Sqm 133 Excess(+) Full Conversion INR
Annual Plan-ANNUAL PLAN /KDSY/ 2025- 26/ PRO NO 403/26 CONSTRUCTION OF ANGANWADY BUILDING NO58- COMPLETION-KODASSEERY GPCHALAKUDY BP-General Civil Work
10.25.2:Item Shifted to Sub head 14 as item 14.73 Item Shifted to head 14 as item 14.74 Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works