Loading…
Loading…
93,483 results • Best match
R/C estimate for Repair and Maintenance of different Street/ Drain and civil, works in W.No. 10
eProcurement System Government of Punjab Created By: DAVINDER SINGH SAINI Created Date/Time: 13-Feb-2026 08:08 PM Tender Title: R/C estimate for Repair and Maintenance of different Street/ Drain and civil, works in W.No. 10 Tender ID: 2026_DLG_157449_6
GENERAL MI PTA ANNUAL MAINTENANCE 2025 26 Vempala 1 Mechanical Maintenance of Vempala 1 LI Scheme under MI Section Thiruvalla Mechanical works Repairs of pump motor and its accessories General Civil Work
OD14935/2025-2026:Charges for overhauling and repairing of star delta starter including bracing the starcontact and levelling replacing the iegs etc complete.
GENERAL MI PTA ANNUAL MAINTENANCE 2025 26 Mannar 2 Mechanical Maintenance of Mannar 2 LI Scheme under MI Section Thiruvalla Mechanical works Repairs of pump motor and its accessories General Civil Work
OD14984/2025-2026:Charges for overhauling and repairing of star delta starter including bracing the starcontact and levelling replacing the iegs etc complete.
For the year 2025-26 under B ward, ward no. 16,17,18,19 carryout Civil related repair works in water tank premises
eProcurement System Government of Maharashtra Created By: Shabbir Shaikh Created Date/Time: 04-Mar-2026 11:39 AM Tender Title: For the year 2025-26 under B ward, ward no. 16,17,18,19 carryout Civil related repair works in water tank premises Tender ID: 2025_PCMCP_1256448_1
Grouting of swimming pool tiles, repair of damaged valley gutter around swimming pool roof structure, painting of facility building and replacement of damaged sanitary fittings with other misc. civil works at Yamuna Sports Complex.
Providing and fixing double scaffolding system (cup lock type) on the exterior side, up to seven story height made with 40 mm dia M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings runners, connection with the building etc wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and approval of Engineer-in-charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding.
GENERAL General Education Department Annual Plan 2025 26 Construction of School Building Areekode Gov Higher Secondary School Vertical extension to the existing two storied building in Malappuram District General Civil Work
APPENDIX-A CONSTRUCTION OF BUILDING