Loading…
Loading…
93,575 results • Best match
The existing building is a double storeyed one gf serves the purpose of library and its office and first floor is a hall with GI sheet roofing.Stair case built of clay bricks is provided outside of the building
Work Name:MLA-SDF-MLA-SDF- 2024-25 Pathanapuram LAC Sri K.B Ganeshkumar MLA-Construction of Building for Reji Smaraka Library Manjakkala Pathanapuram-MLA-SDF- 2024-25 Pathanapuram LAC Sri K.B Ganeshkumar MLA-Construction of Building for Reji Smaraka Library Manjakkala Pathanapuram-General Civil Work
Repair of Civil work in various office of Yadgar Bhawan at Police Commissionerate Jaipur
eProcurement System Government of Rajasthan Created By: RASHI PANWAR Created Date/Time: 05-Jun-2026 11:55 AM Tender Title: Repair of Civil work in various office of Yadgar Bhawan at Police Commissionerate Jaipur Tender ID: 2026_RPHCC_558864_9
RETENDER CONSTRUCTION OF ANAKKUZHINIRAPPU DRINKING WATER PROJECT CIVIL WORK
10.25.2:Item Shifted to Sub head 14 as item 14.73 Item Shifted to head 14 as item 14.74 Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
GENERAL Kattanam Rest House Renovation 2025 Renovation works to PWD Rest House Kattanam Overall Painting False ceiling and other works General Civil Work 1
50.12.5.1:Providing and fixing false ceiling with e board classic tile or equivalent make of size 610x610x4 mm ceiling of approved quality in aluminium frame work with necessary screws etc complete ( aluminium frame work shall be paid separately)
Building
Library construction
Civil repair/maintenance work and painting work for barrack No 02 at GC CRPF Hyderabad
Providing and fixing double scaffolding system (cup lock type) on the exterior side, up to seven story height made with 40 mm dia M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after .The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and approval of Engineerin- charge .The elevational area of the scaffolding shall be measured for payment purpose .The payment will be made once irrespective of duration of scaffolding.