Loading…
Loading…
95,321 results • Best match
Retender for Comprehensive Annual Repair and Maintenance ARM Civil works for 300 Bedded ESIC Hospital Bapunagar Ahmedabad for one year.
eProcurement System Government of India Created By: Narendar Singh Tanwar Created Date/Time: 13-May-2026 01:58 PM Tender Title: Retender for Comprehensive Annual Repair and Maintenance, ARM Civil works for 300 Bedded ESIC Hospital Bapunagar Ahmedabad for one year. Tender ID: 2026_ESIC_897800_2
Repair maintenance of boundary wall control room inside painting and allied civil works at radhanagar Sub-station
M.S. structural works in columns, beams etc. with simple rolled structural members (e.g. joists, angle, channel... as electrodes, gas and hire charge of all tools and plants and labour required for the work including all incidental chages such as electricity charges, labour insurance charges ...
Maintenance works
Work Name:GENERAL-Maintenance works to PWD Rest House Chavakkad-Work-General Civil Work-1
Construction of Retaining cum Boundary wall, RCC approach Road, switchyard development and other allied civil works at Taldanga 33/11 kV Sub-station under Chandannagar Division
Construction of Pope Nagar Canal bridge at chainage 5/000 km of Ollukara branch canal
... ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana... shall have discretion to either re-design the mix or bear the cost of extra cement All work upto plinth levelConcrete of M25 grade with minimum cement content of 330 kg /cum
GENERAL- FDR (SR) works-Construction of CC Drain in Between 6/700 to 6/900 and Reconstruction of culvert at Mulloorkkara Varavoor road Km 6/895-General Civil Work-Retender
3.13.1.B:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Ordinary soil - Mechanical Means - (Depth upto 3 m)