Loading…
Loading…
95,310 results • Best match
Repair and Renovation of NIC office and laying of sewer line under premises of DC SW office Kapashera, New Delhi - 110037. Civil and Electrical work.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources )
AR and MO to District Court Rohini, Delhi dg. 2026-27. SH Repair of Basement, opened drains, damaged water supplying line, railing, finishing and other misc. civil work in the General, VIP Basement and Court Building at Rohini Court Complex, Delhi
A/R & M/O to District Court Rohini, Delhi dg. 2026-27. (SH: Repair of Basement, opened drains, damaged water supplying line, railing, finishing and other misc. civil work in the General, VIP Basement and Court Building at Rohini Court Complex, Delhi). Detailed Schedule of Quantity attached in NIT.
To carry out necessary maintenance/repair and civil work in toilets/urinals under Swachhta Survey Zone No. 03 Ward No. 56.
To carry out necessary maintenance/repair and civil work in toilets/urinals under Swachhta Survey Zone No. 03 Ward No. 56.
Construction of Hi-Tech Nursery at DAF, Thaliparambu-Construction of Polyhouse-General Civil Work
10.25.2:Item Shifted to Sub head 14 as item 14.73 Item Shifted to head 14 as item 14.74 Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
Annual Plan-KBP P No. 278/2025-26 ISSATH NAGAR THIRD STREET SECOND CROSS ROAD DRAINAGE CONSTRUCTIONS - THIRD REACH- P No. 278/2025-26-General Civil Work
ProJ No200of Kainakary G P-Construction of protection wall and renovation of existing construction near panchayath thodu bridge to kaitharam veedu -General Civil Work
5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)