Loading…
Loading…
94,602 results • Best match
CIVIL REPAIR WORK IN QTR NO V-60, V-78, V-93 UNDER SUB DN GANDHI NAGAR I, JAIPUR (SANCTION WORK)
Section: CIVIL WORK IN QTR NO. 5/60(170860)
Civil Work
... 0.330 KG/SQM on the surface of the interval of 3-4 hours. Undulation on the surface is repair before the waterproofing work.
Pr no 197/26-CHURAKKULAM MOTOR SHED CONSTRUCTION-General Civil Work-2025-2026.
10.25.2:Item Shifted to Sub head 14 as item 14.73 Item Shifted to head 14 as item 14.74 Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
DEPOSIT-Technical Highschool Teekoy Open well-Construction of Open Well-General Civil Work
5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
Construction of building including internal (Civil and electrical) installations and services for Advance Research Project on Canine at IVRI, Izatnagar, Bareilly.
1 CIVIL AND ELECTRICAL WORK 57911400 Below 28.01 41690416.86
Construction of Boundary wall and allied Civil works to protect the 33kV S/Stn Mastangarh(Sirsa) from flood water
Miscellaneous work and other allied civil works i.e. Costruction of Ramp work, Brick toe wall and M.S. Work in the S/stn area i/c cost of all material, labour men and machinery complete in all respects as per directions of the Engineer Incharge. (The payment shall be made on actual work Basis)