Loading…
Loading…
95,206 results • Best match
Annual pla 491/2025-26 Construction of roof to Vanitha Vikasana Kendram in division 28 General Civil Work
Renovation of Work
Proposed Construction of W.C. Block for Male, Female, Disabled Person and Transgender with electrification at Civil Court at Seoni Malwa. 2nd Call, PAC Rs. 15.95 Lacs on Building , Electrical Works SOR 01.01.2024 (Ammend-ment upto date), Completion
Proposed Construction of W.C. Block for Male, Female, Disabled Person and Transgender with electrification at Civil Court at Seoni Malwa. 2nd Call, PAC Rs. 15.95 Lacs on Building & Electrical Works SOR 01.01.2024 (Ammend-ment upto date), Completion period 180 days i/c rainy season.
SBM(G)-Construction of Work Shed and Civil Works in Ailapur(V), Korutla Mandal of Jagitial District Est.Cost.Rs.40.00 lakhs(4th Call)
GENERAL-Construction of GLPS -8th Number bridge and Punchirimattom Vanarani bridge in Wayanad District-work-General Civil Work
... approved specifications, drawings, and directions of the departmental officer at site. The work includes the cost of materials, conveyance, labour, machinery, necessary temporary supports... welding and on completion, incidental and handling charges, fixing of handrails and allied works, etc., complete. (Derived from DAR Civil - Spec. No. 10.2, 85.108)
DEPOSIT GCNW- Construction of Toilet Block in Govt college of Nursing Mananthavady Wayanad District-work-General Civil Work
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
the estimate prepared with adequate items and all the items included in estimate are needed for the proper completion of the work
OD273784/2025-2026: Engaging carpenter for minor repair works