Loading…
Loading…
95,158 results • Best match
Civil Maintenance and Repair works of Cracked rooms in Wing 03 and 05 of Ravindra Bhawan at Zone E in IIT Roorkee
scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and approval of Engineer-in-charge. The elevational ...
Repair and Maintenance of various Roads/ Streets and other civil works in Ward no 09 to 17 in MC Ellenabad( 2025-26)
[13.29.2]Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 2. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works [Through Rate]
Annual Rate Contract for repair and maintenance of Civil Works at Meerut-RCS, Airport for the year 2025-2026 and 2026-2027
Urgent Repair and Replacement of false ceiling and others related Works of Rabindra Bhawan Bankura in the District of Bankura Civil Part
... exterior quality Aluminium Composite Panel (ACP) wall cladding on existing Al. /MS frame work with GI brackets, ACP fixed on the existing frame work by folding the edges of ACP panel (Engraving the rear surface of ACP sheet) with CP angles, ...
Construction of boundary wall and other allied civil works to protect the 33 kV sub- station Nehla (fatehabad) from flood water.
Miscellaneous work and other allied civil works i.e. Costruction of Ramp work, Brick toe wall and M.S. Work in the S/stn area i/c cost of all material, labour men and machinery complete in all respects as per directions of the Engineer Incharge. (The payment shall be made on actual work Basis)
GENERAL-CSIND-Protection works to WCC Providing protection works to WCC near Thazhevettoor Masjid-General Civil Work
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil