Loading…
Loading…
95,268 results • Best match
GENERAL-Republic day Celebration for 2026 at SKMJ HSS ground Kalpetta-providing barricade, ground repair, VIP stage and other arrangements-General Civil Work
Work Name:GENERAL-Republic day Celebration for 2026 at SKMJ HSS ground Kalpetta-providing barricade, ground repair, VIP stage and other arrangements-General Civil Work
Kolkata Medical College and Hospital-Necessary civil works for construction of Boundary wall for 33 KV Substation along with some other related works
Constructing Inspection pit of inside measurement 600mm X 600mm X upto 600mm (depth) with 250 mm thick 1st. class brick work in cement mortar (1:4) on all sides, bottom of the pit consisting of 100 mm thick cement ...
Hiring of Third-Party Inspection Agency - Electrical & Electronic Products, Construction/Civil Engineering Works, IT Products & Services; To be entered by buyer as per domain; NABCB
Construction/Civil Engineering Works
Construction of an arch, construction of a compound wall around the building, construction of CC drain, installation of an interlock, installation of a new door at the main entrance of the building, repair of the toilet on the ground floor, repair of ... floor construction of ... office building in ...
Construction of an arch, construction of a compound wall around the building, construction of CC drain, installation of an interlock, installation of a new door at the main entrance of the building, repair of the toilet on the ground floor construction of a new watchman room at the commercil Tax Deputy Commissioners office building in Chikkmagalur town
Annual Plan-2025-26 Mundottupoyil Chudalakkal Road Construction in chatahmangalam gramapanchayath-pro no 622 ward-03-General Civil Work
Work Name:Annual Plan-2025-26 Mundottupoyil Chudalakkal Road Construction in chatahmangalam gramapanchayath-pro no.622,ward-03-General Civil Work
Construction of addl. 12.5 MVA T/F plinth alongwith allied civil works at 220 KV S/S Ablowal
Earth Work in Excavation in foundation trenches etc. in all kinds of soil where pick jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches , stacking the excavated soil clear from edge of excavation and subsequent filling around masonary in 15 cm layers with compaction including disposal of all surplus soil as directed with in lead of 30 metres.