Loading…
Loading…
95,617 results • Best match
CIVIL WORK OFFER
15.23.1 : Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.For thickness of tiles 10 mm to 25 mm
CIVIL WORK
75.5.5.A.1pb:Modified Penetration Macadam 50 mm thick using Bitumen S-65 - Packed Bitumen Rates Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse ...
CIVIL WORK
75.5.5.A.1pb:Modified Penetration Macadam 50 mm thick using Bitumen S-65 - Packed Bitumen Rates Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse ...
Addition in Existing Building along with repair and renovation of MCL Building Zone D Sarabha Nagar
Addition in Existing Building along with repair and renovation of MCL Building Zone D Sarabha Nagar
GENERAL-NAVAKEARALA SADASSU2023-24-Uregent side protection works at Thodu near Kandenkavu-Urunian padashekharam-General Civil Work
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
Annual Plan-Mavoor GP - 2025-26-PROJECT NO 117/25-26 - GRAMAVANAM PROTECTION WORKS-General Civil Work
Protection Works