Loading…
Loading…
96,824 results • Best match
Annual Plan-DPK 57/26-Ponkunnam Division-Vazhoor Grama Panchayat High School Kallooparambu Road Construction-General Civil Work(Retender)
Annual Plan-CHATHAMANGALAM GP PLAN 2025-26 CHATHAMANGALAM PONTEDATH SREEKRISHNASHETHRAM ROAD CONSTRUCTION, PROJECT NO210-WARD NO20-General Civil Work
ROAD WORK
Re Tender Annual Plan-Karukutty GP Pro No199-26-StPeters Road Irish Drain Construction Ward-15- General Civil Work
OD418718/2025-2026:(75.8.1 Modified: Excluding form work) Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. Max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification (i) Nominal mix (1:2:4)
Refer tender document
10.25.1:Item Shifted to Sub head 14 as item 14.73 Item Shifted to head 14 as item 14.74 Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In stringers, treads,landings etc. of stair cases, including use of chequered plate wherever required, all complete
PWD WORKS
11.1.1.1:Excavation for Structures Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. I. Ordinary soil (i) Upto 3 m depth
This estimate is prepared for resolving the dilapilated condition of sewer lines and manholes.The items included are constructing new manholes, laying 150 mm pipelines, and cleaning manholes and allied works.
50.18.9.19.1:Providing and fixing PVC pipes including fixing the pipe with clamps/ clips/ at 1.00 m spacing . This includes jointing of pipes with one step PVC solvent cement and testing of joints complete as per direction of Engineer-in-Charge 110 mm dia 6 Kgf/cm2 - External work- Exposed on wall