Loading…
Loading…
98,610 results • Best match
Construction
3.13.1.B:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Ordinary soil - Mechanical Means - (Depth upto 3 m)
Construction of Toilet
OD284553/2025-2026 Providing & fixing on roof pressed clay tile (Mangalore tile) of 20 mm nominal thickness and of approved size and as per approved pattern on steel frame work complete (steel frame work to be paid separately)(modified 12.48 20% of laying new MP tiles for above 5m height)
earthwork laying of 15 cm thick GSB cement concrete 1_2_4 Provision for a name board
16.78.1:Construction of granular sub- base by Providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, Carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with ...
Refer Tender Document
Road Work
Refer tender document
3.4:Construction of Embankment with Material Obtained from Borrow Pits <br> Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5
The Estimate includes provisions for earth work excavation DR Foundation RR Basement load bearing structure with height of 2.5m Solid block masonry for super structure plastering flooring painting grill work for venilators PVC doors
General work