Loading…
Loading…
98,747 results • Best match
Annual Plan 2025-26 Proj No 40/26 Construction of Kuttiyil Idavazhi Footpath ward 7 Vallikkunnu GP General Civil Work
... with Well Graded Material (Table 400.1) <br> (A) By Mix in Place Method <br> Construction of granular sub-base by providing well graded material, spreading in uniform layers with ...
Annual Plan IDP 2025 26 CONSTRUCTION OF DOUBLE CUTTING KALYANATHANDU ROAD IN MARIYAPURAM G P 1106 26 General Civil Work
CONSTRUCTION OF ROAD
LAC-ADS-Thrithala LAC-2025-26-Construction of Modern Kalikkalam -Phase I at Thrithala GP, Palakkad District-General Civil Work
10.25.2 Item Shifted to Sub head 14 as item 14.73 Item Shifted to head 14 as item 14.74 Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
MP-LADS-24-25-Construction of Pathanam Parambath-Palapparambil Road, Ward-7,Madavoor GP-In Koduvally BP-General Civil Work
3.14:Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.
Construction of Protection wall for Mudickal Sub Branch Canal Chainage 6.90 KM, Ward 11, Vazhakkulam Grama Panchayath-General Civil Work
60.1.2:RING BUND Type II Putting up ring bund with earth fille gunny bags of top width 1.0m bottom width 2.0m height 2.0 m side and filling in between with earth to form ring bund and maintaining the same leak proof till the completion of the work and clearing the site by dismantling the bund after completion of the work.etc.complete.
Annual Plan-Kannur DP Annual Plan Proj. No. 279/2025-26-GHSS Mathil-Construction of Urinal complex-General Civil Work
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil