DEPOSIT-Fire and Rescue DG Office-Store Renovation-General Civil Work
15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge.
Corrigendum - Renovation of Second Floor Area (Civil works) at Bank’s Main Office Building, Bhubaneswar
Construction of Civil works of Barrage and Stilling basin, U/s Plastic cutoff trench, Power Intake Structures, Tunnel, outfall Structure, associated HM works including adit plug, etc and associated works of Link-3 Project in Himachal Pradesh
Building and Architectural works
Repairs and renovation of PU Ele School RCC Roof Building at Parikkalpattu Panchayat in Thimiri Panchayat Union
Repairs and renovation of PU Ele School RCC Roof Building at Parikkalpattu Panchayat in Thimiri Panchayat Union
Special repairing and renovation of old electrical installations at proposed visitors area, modular kitchen and balcony at Second Floor South-West Block of Main Building of Lok Bhavan Kolkata in parity with related Civil renovation works.
Cutting channel of 43 mm x 43 mm size on masonry wall incl. S&F heavy gauge polythene pipe dia as stated below, by means of iron hooks and supplying and drawing 18 SWG GI Wire as fish wire incl. mending good damages to building works
Painting and other repair works of LCS, MRS, AC Plant room and SHR Hostel of IIT Bhubaneswar
DSR’2023, Item No.14.72 Providing and fixing double scaffolding system (cup lock type) on the exterior side, up to seven story height made with 40 mm dia M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after .The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and approval of Engineer in-charge .The elevational area of the scaffolding shall be measured for payment purpose .The payment will be made once irrespective of duration of scaffolding.