Loading…
Loading…
8,276 results • Best match
CONSTRUCTION OF TOILET AT 33/11 KV ELECTRICITY SUB-STATION JAKHLAUN AND ROOF TREATMENT OF QUARTERS AT 33/11 KV ELECTRICITY SUB-STATION TALBEHAT AND OTHER ASSOCIATED CIVIL WORKS DISTRICT-LALITPUR.
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works (DSR 10.25.2)
GENERAL ASE WORKS 2025 26 ASE 2025 Urgent protection works using Geo bags in between CESCP No 518 520 near Perumpilly in Arattupuzha Panchayath of Harippad LAC(Balance Portion) General Civil Work
EMERGENCY ASE WORKS
INSTTALATION OF TUBEWELL BORING AT 33/11KV SUB-STATION RAAJGIR AND AT KATERA AND KHADAINI AND CONSTRUCTION OF FIREWALL AT 33/11KV SUB-STATION GARAUTHA AND OTHER ASSOCIATED CIVIL WORKS, DISTRICT-JHANSI.
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. (DSR 10.25) In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works (DSR 10.25.2)
nagar nigam kota area zone 3 and 4 various prakrati civil construction and maintenance various palace total station servey desingn structure design etc work 3 nit 12
WORK NAME
CONSTRUCTION OF TOILET TRENCH COVER, KALPI ROAD ORAI , 33/11 KV ELECTRICITY SUB-STATION KALPI ,ORAI AND CONSTRUCTION OF SWITCHYARD AND OTHER ASSOCIATED CIVIL WORKS AT 33/11 KV ELECTRICITY SUB-STATION NIYAMATPUR DISTRICT-JALAUN.
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works (DSR 10.25.2)
Facility Management Services - LumpSum Based - Levelling of Switchyard and Raising of Pathways with Sand Earth Filling and Toe Wall Construction Due to Waterlogging at 33 11 KV Substation Erabadiyar District Unnao; Civil Works; Consumables to be prov..
Facility Management Services - LumpSum Based - Levelling of Switchyard and Raising of Pathways with Sand Earth Filling and Toe Wall Construction Due to Waterlogging at 33 11 KV Substation Erabadiyar District Unnao; Civil Works; Consumables to be prov..