Loading…
Loading…
8,491 results • Best match
CIVIL WORK
Earth work in Hard soil for foundatiion within 50 mts. Initial lead and lift of 1.5 mt including rough dressing and breaking clots to maximum 5 to 7 cm and laying in layers not exceeding 0.3 mt in depth as Per the direction of Engineer – in – Charge.
CIVIL WORK
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
CIVIL WORK
Providing Wood Work in frames of doors, windows and clerestory windows and other frames wrought framed and fixed in position complete job. Finished work to be measured. K.D Wood.
Civil Work
Steel work welded in built up sections/ framed work, including cutting, hoisting, bending fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.
Civil Work
Construction of Reinforced cement concrete (RCC) pavement of thickness as per design, over a prepared sub-base, with 43 grade cement or any other type as per Clause 1501.2.2, M30 (grade) coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 20mm mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the form work as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant near approaches to bridges and culverts (expansion joints), admixtures as approved, curing of concrete slabs for 14 days, curing compound and water finishing to lines and grade as per drawing and Technical Specification Clause 1501.Panels are to be made by cutting grooves of 3 to 5mm thick and 25 to 30mm deep in CC slab.The grooves are to be filled with VG-30 Bitumen with a spray of fine sand at top. (Ready-Mix-Concrete)