Loading…
Loading…
8,573 results • Best match
Renovation of Old Srirangapatna Muncipality Office Building and Continuation of Additional Muncipality Building Construction work, Construction of Assembly Hall near Srirangapatna PWD IB Krishna Murthy Bungalow), Construction of Library near Advocate ... Association building in ... Court, Construction of ... Panchayat Building in ...
Renovation of Old Srirangapatna Muncipality Office Building and Continuation of Additional Muncipality Building Construction work, Construction of Assembly Hall near Srirangapatna PWD IB Krishna Murthy Bungalow), Construction of Library near Advocate s Association building in the premises of Srirangapatna Court, Construction of Taluk Panchayat Building in Srirangapatna taluk.
Repair/ renovation of the existing building to set up UH and WC at existing old community Hall, Ward No-35
Renovation and Repair of Water tank And Pump House at Mahim Police Colony building no. 15 and 16, Mahim , Mumbai.
Renovation and Repair of Water tank & Pump House at Mahim Police Colony building no. 15 and 16, Mahim , Mumbai.
GENERAL Pre Monsoon Work in various roads under Pandalam Section 2026 Civil work General Civil Work 1
Pre Monsoon Work
Maintenace Work And Roof Treatment Work And Other Related Civil Work At EDC Office Hamirpur
Maintenace Work And Roof Treatment Work And Other Related Civil Work At EDC Office Hamirpur
REPAIRS TO ANGANWADI BUILDING MARUNGUR AT MARUNGUR PANCHAYAT IN PANRUTI BLOCK
Providing and Applying CFTRI approved two component flexible polymer modified acrylic cementitious waterproofing coating with a mix ratio of (5 Liquid :7 Powder) to the RCC surface like Roof, bathroom, toilet, balcony & utility area applied @ 2.2kg/m2 in 2 coats to achieve 1.2mm DFT, having Elongation at break >120% as per ASTM D 412, Tensile strength >1N/ mm2 as per ASTM D 412, Adhesion strength: 0.80N/mm2 as per ASTM D 4541, crack bridging upto 2mm as per ASTM C 836. The finished cost to include surface preparation, making coving of 50 mm X 50mm at all right angles of wall Junction with Polymer Repair Mortar and lay 45 gsm glass fibre mesh over the angle fillet when the first coat in still wet, treatment of cracks completely as per specification