Loading…
Loading…
8,511 results • Best match
ANNUAL REPAIR WORK OF NON-RESIDENTIAL BUILDING AT SUB -DIVISION KURUD, DISTT.-DHAMTARI (C.G.)
SPECIAL REPAIR WORK OF NON-RESIDENTIAL BUILDING AT SUB -DIVISION KURUD, DISTT.-DHAMTARI (C.G.)
Repair and Maintenance of Morbi MDG Post Office Building under Rajkot Dn 3rd call.
ANGANWADI BUILDING NEED REPAIR FOR FLOOR,WINDOW WORK AD CHINURPUDUPATTAI PANCHAYAT in Parangipettai block
Painting TWO coats of new iron works such as steel doors, windows,ventilators, window bars, balustrades etc., with best approved first quality of synthetic enamel paint of approved colour over the existing priming coats, etc., complete complying with standard specifications and as directed by the departmental officers.
Annual repair estimate Mini sectt. Building at Meham in Rohtak Distt.2026-27 (Reinvited)
All BOQ items for the work Annual repair of PWD B and R Colony at Rohtak for the year 2026-27
Providing EPs for fixing the under slung crane and other civil works around USTF building at IGCAR, Kalpakkam.
Providing and fixing double Tubular scaffolding system using H-Frames / APS system or (cup lock type) on the exterior side made with 40mm dia M.S. tube 1.5m centre to centre horizontal and vertical tubes joining with cup and lock system with M.S. tubes, M.S. tube challies, M.S clamps and M.S staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it thereafter. The scaffolding system shall be stiffened with bracings, runners, connection with building etc. wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and as approved by the Engineer -in-Charge. Note : 1. The elevation area of the scaffolding shall be measured for payment purposes. 2. The payment shall be made once irrespective of duration of scaffolding. 3. The scaffolding system drawing shall be got approved by Engineer-in-Charge. 4. The contractor has to observe all safety procedure while working on heights as per I.S. 3696 (Part-I) (Safety Code for scaffolds). 5. Screen of suitable material shall be provided to the full height of scaffolding and securely tied to protect falling objects coming out during the work is in progress. 6. Necessary aluminium / M.S. ladder shall be provided at the cost of the contractor, to the full height of scaffolding at required location around the building to enable Departmental Supervisor/Engineer climb up and closely watch the repair work of the building.