Repair of Non-Operational Modules Lab 1, Lab 2, Lab 5 and Office Room 2 of HRDC Building
Repair and Maintenance work of Control Room Building at Seherabazar 33 11 KV SubStation under Burdwan South Division.
b)Earth work in filling in foundation trenches or plinth with good earth in layers not exceeding 150 mm including watering and ramming etc layer by layer complete (Payment to be made on the basis of measurement of finished quantity of work) i)With earth obtained from exavation of foundation.
KTPS-VII Stage - Civil - O and M-I - SD-III - Repairs to the damaged road by laying wet mix macadam (WMM) road leading to Silos gate, KTPS(O and M)
Excavation for road work in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the required location with all lifts and lead upto 1000 m as per Technical Specification Clause 301 MORTH and Complete finished item of work as directed by the Engineer-in-charge.
BOQ
Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. Welded.
Inviting for the Supply of Building Material for Construction of Pandhan Rasta
Retender
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)