Loading…
Loading…
8,225 results • Best match
BOQ
Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. Welded.
BOQ
Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. Welded.
Construction of building for the Center for Distance and Online Education at 1st floor of building of University Works Department at GJU SandT, Hisar
[NS Item] Supply of 20 watt LED Tube Light rod, 4` long suitable for rated voltage 220-240V AC working range:- 140-270 V A`c , 50 Hz plus _ 5%, AC supply with aluminium alloy base, frosted polycarbonate diffusers with power factor )0.90, Total Harmonic Distortion (THD) ( 20%, system current - 0.085A, system efficiency ) 85% , with operating temp. -20° C to 45° C, Lumen output for LED tube should be =2100 lumen and overall lumen/watt of luminaire should be greater than 75%, C.R.I. of LED )75 with correlated colour temperature (CCT) of 6500 plus minus 500 K, minimum burning hour life )40000 hours,LED viewing angle 120 Degree , Make of LED-OSRAM / Samsung/Cree/Nichia complete in all respect with the entire satisfaction of the Engineer-in-incharge. (Make of tube fitting: Philips/Osram/Havells/WIPRO). Supply of Industrial General Purpose 4` long tube fitting suitable to house 1x18w LED tube rod 4` long, CRCA steel
Proposed Construction of LCH Full Motion Simulator Building for MCSRDC Division HALDC.
Construction of Govt. ITI Building (4 Trade) at Bardod, Distt. Kotputli-Behror
Construction of tube-well from ground levels and upto 100 Meter depth and above to accommodate housing and assembly pipe of following sizes in all types of alluvium strata by percussion/ rotary drilling method and with gravel as per IS:4097-1967 and packing as per IS:2800 (Part I -& II) 1979 as amended upto date (the work includes the cost of gravel & its primary packing and packing during development, lowering of housing & strainer assembly pipes, with supply and wrapping of coir-rope, wherever necessary, for arresting fine sand particles. The work will not include cost of housing pipe and strainer pipe assembly and development work, but work would be completed after obtaining sand free water).200mm NOMINAL BORE
Construction of Fire Station Building at REIZ Karni Ph I II Bikaner
Providing and laying in position Ready mix concrete manufactured in fully automatic Batching Plant and transported to site in transit mixer for having continous agitated mixer, manufactured as per approved mix design of specified grade of RCC work including pumping of R.M.C. from transit mixer to site of laying , exculding the cost of centering, shuttering and reinforcement with all lead and lift including cost of admixtures in recommended portion as per IS 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer in charge. All works upto floor V floor M20 grade Design Mix by using cement as per codal provision.