Loading…
Loading…
8,153 results • Best match
REPAIR OF FALSE CEILING, WALL PANELLING, KITCHEN CABINETS AT GR UNITS, REPAIR OF DAMAGE AND BROKEN ROOF SHEET, WELCOME MAINT OF VARIOUS MD ACCN, REPAIR OF KITCHEN CABINETS AND ATT AND PAINTAING OF VARIOUS BUILDING AT ENGINEER LINE, KURUKSHETRA LINES
Supply and fixing mild steel framed work for Iron work & STP chamber cover comprising MS angle/frame with MS sheet cover of thickness as specified by Engineer-in-Charge, including handles, hinges, locking arrangement, welding, cutting, drilling and painting complete, with ends of bars shouldered and/or riveted, fixed in position complete all as specified and directed by Engineer-in-Charge. Note: Measurement and payment shall be made by weight in Kilograms (Kg) of finished MS work actually executed at site.
GENERAL-Premonsoon work 2026-27 for various PWD Roads under Roads section Madayi in Kannur District- 5nos. of road stretches for a length of 39.88km.-.-General Civil Work
APPENDIX-A: Premonsoon Works
Construction of Deep Bore Well Inside Permisses of Ghatgaon (R and B) Section Office in the District of Keonjhar as per EIC Civil Odisha Lr. No. 7351 dt. 02.03.2026 Buildings.
Construction of 2nos production wells including scientific source finding through consolidated and unconsolidated rock with down the hammer drilling rig or combination rig with PVC pipe and installation of submersible pump set with all acessoriesLabour for drilling a perfectly vertical bore hole of specified dia for a specified depth below ground level through consolidated and unconsolidated rock with down the hole hammer drilling rig or combination rig as required to suit the site condition as per the direction of the Engineer in charge including use of own rig with its accessories, tools and plant and consumables etc for lowering of 200mm/150mm dia G.I/P.V.C/M.S casing pipes for housing fitted with socket and with or without well screen as per the necessity for soft, medium, hard and boulder formation (G.I/ P.V.C/ M.S casing pipes if required to prevent collapse of overburden is to be provided by the contractor including lowering and withdrawing after completion of the tube well), 200mm dia to 400mm dia in overburden portion including packing of gravel supplied by the contractor for 400mm dia bore onlyDrilling of 200mm dia bore00 mtr to 30mtr
Work contract for Watch ward and complaint/store attendant at various civil site offices at SGTPS MPPGCL Birsinghpur 2026-27
Work contract for "Watch & ward and complaint/store attendant at various civil site offices at SGTPS, MPPGCI, Birsinghpur 2026-27.
Construction work of approach road (approximately 500 meters) for the under construction building of Sub Divisional Transport Office, Roorkee.
Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.
Tracing, Repairing of Damaged/Buried Manholes and Construction of Manholes in the Sewerage Network in Rani Bagh Ward No. 60 and Saraswati Vihar Ward No. 58 of AC-15 under EE(Civil)-17.
Tracing, Repairing of Damaged/Buried Manholes and Construction of Manholes in the Sewerage Network in Rani Bagh Ward No. 60 and Saraswati Vihar Ward No. 58 of AC-15 under EE(Civil)-17.