Loading…
Loading…
8,153 results • Best match
Construction of Building of Angan badi Kendra in Upper Bazar Under Block- Bermo Bokaro.
Providing designation 75 B brick work in C.M. (1:6) in foundation and plinth with approved quality of clean coarse sand of F.M. 2 to 2.5 including providing 10mm thick mortar joints, cost of screening materials, raking out joints to 15mm depth, curing, taxes and royalty all complete as per building specification and direction of E/l.B.C.D (5.2.6)
Construction of Building of Angan badi Kendra in Tetuliya-2 Under Block-Chandankiyari Bokaro.
Providing designation 75 B brick work in C.M. (1:6) in foundation and plinth with approved quality of clean coarse sand of F.M. 2 to 2.5 including providing 10mm thick mortar joints, cost of screening materials, raking out joints to 15mm depth, curing, taxes and royalty all complete as per building specification and direction of E/l.B.C.D (5.2.6)
Construction of Building of Angan badi Kendra in Nuniyadih-2 Under Block-Chandankiyari Bokaro.
Providing designation 75 B brick work in C.M. (1:6) in foundation and plinth with approved quality of clean coarse sand of F.M. 2 to 2.5 including providing 10mm thick mortar joints, cost of screening materials, raking out joints to 15mm depth, curing, taxes and royalty all complete as per building specification and direction of E/l.B.C.D (5.2.6)
Construction of Gutter near J V Sahara building in W.No.27 in VVCMC Area .
Construction of Gutter at Naigaon Parera nagar near J V Sahara building in W.no. 27 in V V C M C area.
Construction of 33 kv s/s building and boundary wall at Oulvi (R/W)
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting (height upto 10 m) , fixing in position and applying a priming coat of approved steel primer all complete: (B-98/ 9.2)
Construction of 33 KV Sub Station Building and Boundary Wall at Sojiyo ki Dhani
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting (height upto 10 m) , fixing in position and applying a priming coat of approved steel primer all complete: (B-98/ 9.2)