Loading…
Loading…
8,145 results • Best match
Construction of 33 KV Sub Station Building and Boundary Wall at Dala Ram Ki Dhani
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting (height upto 10 m) , fixing in position and applying a priming coat of approved steel primer all complete: (B-98/ 9.2)
Construction of 33 KV Sub Station Building and Boundary Wall at Buda Tala (AEN Bhinyad).
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting (height upto 10 m) , fixing in position and applying a priming coat of approved steel primer all complete: (B-98/ 9.2)
Construction of 28M X 10M (G plus 1 with Mezzanine) control building at Siliguri Terminal
... and laying in position ready mixed M-25 grade concrete for reinforced cement concrete work using cement content as per approved design mix manufactured in fully automatic batching plant & transported to site of work in transit mixer for all leads having continuous agitated mixer, manufactured as per ...
06 CONSTRUCTION OF TWO ROOM SCHOOL BUILDING FOR Z P SCHOOL RANMALA AT MALANGAON TAL.K.MAHANKAL
... excluding the door frame, stainless steel fixtures and fastening and finishing the wood work with oil painting three coats, excetra complete. (For Ground Floor) Item / Page No : ...
CA NO. GE AF NO.1 / GUR-51 / 2026-27 REPAIR/ MAINT OF ELECTRIC FITTINGS FIXTURES, BUILDING SECURITY LIGHTS BAY LIGHT EARTHING, REPAIR OF CEILING /EXHUAST FAN AND OTHER MISC E/M WKS REPAIR/ MAINT OF SOLAR WATER HEATER, GI TUBING 13 BRD
... including providing new nuts & bolts, gasket packing, worn out brass flange including brazing work , all other required hidden work for complete descaling complete all as specified and as directed by Engr-in-charge.
Proposed Construction of Terrace Shed for Solar Installation on the Academic Complex Building, COEP Technological University, Pune.
Civil Work