Loading…
Loading…
7,884 results • Best match
Annual Plan LSGD ANNUAL PLAN 2025 26 CHEKKIAD GP PR NO 274 Maintenance of Panchayath Subsidiary Offices IN WARD 13 General Civil Work
21.1.1.2:Providing and fixing aluminium work for doors, windows, ventilators and partitions with extruded built up standard tubular ...
LAC ADS MLA ADS 2025 26 Arayalmuk Kakkakunnu road tarring and side concrete in Sooranad South GP in Kunnathur LAC General Civil Work
Appendix C - Side Protection Work
AMRUT-Retarring of kanakavalli asoka company road(ch 00 000 to 0 380) div-23-Sl. No. 34 Elayavoor zonal-General Civil Work
75.5.5.B.2pb:Modified Penetration Macadam 75 mm thick using Bitumen S-65 - Packed Bitumen Rates Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse ...
Construction of Meeting Hall at 1st floor of CDVO Office Building Balasore for the year 2026-27
R.C.C. work M-20 in grade having a minimum compressive strength (in work test) 200 kg/cm2 in 15cm cubes at 28 days using 12mm. & down grade hard granite C.B.... royalties of all materials, cost of labour & T&P rand other machinsries required for the work complete but excluding cost and carriage of HYSD bars and cost of bending, binding tying ...
Construction of CC Road infront of ER Building (19-24) in PTS Colony in Ward No.10
Earth Work Cutting/ Levelling in hard soil or Gravely soil within 50m initial lead and 1.5mt initial lift including rough dressing and breaking clods to maximum 5cm to 7cm laying in layers
Upgradation to MPs Bungalows under Sub Div-I of PaWD-I, New Delhi, dg 2026-27. (SH: Upgradation work in Bungalow No.29 Canning Lane & 14 Windsor Place.) Subwork/Packages: Civil work