Loading…
Loading…
7,766 results • Best match
Construction of Anganwadi Building at Nagsar Village, Doulthabad Mandal of Vikarabad District With Esst Cost. Rs.20.00 Lakhs Sanctioned under KADA 2025-26 Grant 1st Call
... steel bars (Fe 415/ Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and... tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including ...
Construction of Anganwadi Building at Sulthanpur Village, Doulthabad Mandal of Vikarabad District With Esst Cost. Rs.20.00 Lakhs Sanctioned under KADA 2025-26 Grant 1st Call
... steel bars (Fe 415/ Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and... tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including ...
Heightening of tower in existing 110KV Bagalkote to Kaladagi SC line between Loc No.57-58 to maintain ground clearance for public safety b/w Kaladagi to Kainakatti road in TLM Section KPTCL Bagalkote including supply of materials/ equipments, ... erection, civil works, ... civil works , ...
6 Building and other construction workers welfare Cess for Supply, Erection and Civil Portion works
Extension of ladies Toilet of 1st floor and 3rd floor ,painting and necessary repair of toilet from 1st floor to 3rd floor at Admin Building of CSTARI,Sect. V, Saltlake, Kolkata during the year of 2026-27.
Construction of the remaining works of the Parvatiya Vikas Bhawan Hill Development Building under the Sitarganj Assembly constituency pursuant to Honble Chief Ministers Announcement No 484 2025
Reinforced cement concrete work in walls (any thickness), includingReinforced cement concrete work in walls (any thickness), includingattached pilasters, buttresses, plinth and string ...
Construction of Anganwadi centre building at Pooranankuppam village under the control of ICDS Project III, Ariyankuppam, belonging to the DWCD through PWD, Puducherry under the ICDS Scheme
Construction of Anganwadi centre building at Pooranankuppam village under the control of ICDS Project-III, Ariyankuppam, belonging to the DWCD through PWD, Puducherry under the ICDS Scheme.