Loading…
Loading…
8,369 results • Best match
ROOF TREATMENT AND PLASTER REPAIR OF CIVIL WORKS INCLUDING SPECIAL REPAIR WORK AT 33/11 KV S/S BAH (TOWN), 33/11 KV S/S BAH (RURAL) AND 33/11 KV S/S JARAR UNDER DISTRICT AGRA
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. (DSR 10.25) In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works (DSR 10.25.2)
Civil Development work /Road works and associated works with an item of concrete Paver block
31 Guidelines for Air Pollution mitigation (i) The charges for the Air Pollution mitigation measures shall be borne by the contractor without any extra cost to the department. (ii) Contractor shall follow the directions for Dust and Pollution Control measures in construction as notified by MoEF&CC / MoHUA / CPWD / BMC or any other statutory authority. (iii) All precautionary measures for control of Air Pollution due to Building Construction Activity shall be taken as per Local Statutory/ Municipal Authority Air Pollution Mitigation Plan. (iv) Mandatory Form for Building Construction activity to control Air Pollution along with supporting documents and site photographs shall be submitted to concerened authority or uploaded on online portal. (v) Projects attracting Environmental Clearance shall carry out Third Party Ambient Air Monitoring every fortnightly from NABL / MoEF&CC laboratory.
Civil Development work /Road works and associated works with an item of concrete Paver block
31 Guidelines for Air Pollution mitigation (i) The charges for the Air Pollution mitigation measures shall be borne by the contractor without any extra cost to the department. (ii) Contractor shall follow the directions for Dust and Pollution Control measures in construction as notified by MoEF&CC / MoHUA / CPWD / BMC or any other statutory authority. (iii) All precautionary measures for control of Air Pollution due to Building Construction Activity shall be taken as per Local Statutory/ Municipal Authority Air Pollution Mitigation Plan. (iv) Mandatory Form for Building Construction activity to control Air Pollution along with supporting documents and site photographs shall be submitted to concerened authority or uploaded on online portal. (v) Projects attracting Environmental Clearance shall carry out Third Party Ambient Air Monitoring every fortnightly from NABL / MoEF&CC laboratory.
Repairs to Toilet, Drainge line and Misc. Civil Work at Samras Girls Hostel and Samras Boys Hostel at Rajkot.
Passage, in Building by avaliable material with require the material from
GENERAL-Thodupuzha Road Bridge- Bridge Safety -Urgent Repairs to Thodupuzha Road Bridge under Muvattupuzha Section-General Civil Work
OD50182/2025-2026:Providing and fixing double scaffolding system (cup lock type) on the exterior side, upto seven storey height made with 40mm dia M.S. tube 1.5m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S tubes challies, M.S clamps and M.S staircase system in the scaffolding for working platform, etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc. whereever required for inspection of work at required location with essential safety features for the workmen etc. complete as per directions and approval of Engineer-in-charge. The elevation area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. Note :- The item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done.
Work of Construction of 1 no. Addl. 20 MVA 66/11 KV TF plinth along with allied civil works and Extension in control room at 220 KV S/S Kakrala
Earth Work in Excavation in foundation trenches etc. in all kinds of soil where pick jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches , stacking the excavated soil clear from edge of excavation and subsequent filling around masonary in 15 cm layers with compaction including disposal of all surplus soil as directed with in lead of 30 metres.