Loading…
Loading…
8,281 results • Best match
ADEN (HQ-II)/JP sub division: Zonal work Zone no. 10 DO (Excl.) to GGC(Excl.) Railway colony staff quarters, service building for Sanitary work, all type of repair work , road work and Horticulture work etc. as per DSR of 2023 for the period of from ... SSE( Works ) ...
Estimate for Rehabilitation, Renovation Modernization of DaburjiDisty from RD 28650 to 48500
Earth work in excavation of foundation of structures as per drawing and technical specification,including setting out,construction of shoring and bracing, removal of stumpsand other deleterious matter, dressing of sides and bottom and backfilling with excavated surplus soil. In Ordinary soil,Mechanical Means,Depth upto 3 m
Estimate for Rehabilitation, Renovation Modernization of DaburjiDisty from RD 15000 to 28650
Earth work in excavation of foundation of structures as per drawing and technical specification,including setting out,construction of shoring and bracing, removal of stumpsand other deleterious matter, dressing of sides and bottom and backfilling with excavated surplus soil. In Ordinary soil,Mechanical Means,Depth upto 3 m
REPAIR AND RENOVATION OF ASSISTANT EXECUTIVE ENGINEER RESIDENCE AT SUB DIVISION MARWAH
Repairs to plaster of thickness 12mm to 20 mm in patches of area 2.5 sq.meters and under, including cutting the patch in proper shape raking out joints and preparing and plastering the surface of the walls complete including disposal of rubbish to the dumping ground within 50 meters lead With cement mortar 1:4 (1 cement : 4 fine sand)
Renovation and Modernization of the existing Guest House situated at Loktak Project
Dismantling wood work in frames, trusses, purlins and rafters up to 10 metres span and 5 metres height including stacking the material within 50 metres lead. 15.13.1 of sectional area 40 square centimetres and above.
Renovation of irrigation khul from Asthana Yoglungs via Lamfet Near Jamia Sankoo
Earth work in excavation by manual means in foundation trench or drains (not exceeding 1.5m in weadth or 10 sqm on plan )including dressing of sides and ramming of bottoms ,lift upto 1.5m ,including getting out the excavated soil and disposal of surplus excavated soil as directed ,within a lead of 1 mtr