Loading…
Loading…
8,358 results • Best match
Please refer BOQ
Steel work welded in built up sections/fromed work. including cutting, hosting, fixing in position and applying a priming coat of approved steel primes using structural steel ete as required In red. In gratings frames, guard bar, ladder, railings, brackets, gates and similar works
ITEM RATE TENDER FOR REPAIRING AND RENOVATION and SUPPLY WORK FOR S.D.AGRICULTURAL UNIVERISTY
Estimate for Rehabilitation, Renovation Modernization of DaburjiDisty from RD 48500 to 74420 Tail
Earth work in excavation of foundation of structures as per drawing and technical specification,including setting out,construction of shoring and bracing, removal of stumpsand other deleterious matter, dressing of sides and bottom and backfilling with excavated surplus soil. In Ordinary soil,Mechanical Means,Depth upto 3 m
Estimate for Rehabilitation, Renovation Modernization of Daburji Disty from RD 0 to 15000
Earth work in excavation of foundation of structures as per drawing and technical specification,including setting out,construction of shoring and bracing, removal of stumpsand other deleterious matter, dressing of sides and bottom and backfilling with excavated surplus soil. In Ordinary soil,Mechanical Means,Depth upto 3 m
Estimate for Rehabilitation, Renovation Modernization of Bath Minor from RD 0 to 15000
Earth work in excavation of foundation of structures as per drawing and technical specification,including setting out,construction of shoring and bracing, removal of stumpsand other deleterious matter, dressing of sides and bottom and backfilling with excavated surplus soil. In Ordinary soil,Mechanical Means,Depth upto 3 m
Estimate for Rehabilitation, Renovation Modernization of Nurdin Minor from RD 0 to 13420
Earth work in excavation of foundation of structures as per drawing and technical specification,including setting out,construction of shoring and bracing, removal of stumpsand other deleterious matter, dressing of sides and bottom and backfilling with excavated surplus soil. In Ordinary soil,Mechanical Means,Depth upto 3 m