Loading…
Loading…
8,502 results • Best match
Renovation of Main Building, Sanitary Work and Other in Senior Officers Flat No. 8/8 at Booty, Ranchi (Change of Occupancy)
Suppling, fitting and fixing good quality, well dressed and well seasoned sal wood work in chaukhat in doors, windows, skylight, fanlights and C/W celetial windows openings, including wedge over all clamps all complete including application of two coats of wood preservative of approved quality on the surface butting walls and lintels all complete as per building specification and direction of E/l
Electrical renovation related to load capacity upgradation for the office of the Superintending Engineer Planning CircleII PH E Dte Bikash Bhawan
Supplying and fixing PVC Rigid Conduit 'FR' [Precision Make] on wall, ceiling with saddles and other accessories as required and mending good damages to building works 25 mm size
Renovation and Restoration work of Remaining Lining portion from Ch. 11400 mt to 12600 mt of Karjan Right Bank Main Canal.
4 lining during construction with two coats of primer and filled with bituminous and fine sand 2880.14 meter 34.70
Renovation of Plumbing and Sanitary Works for the Gallery Visitor Toilet and Guest House Rooms at District Science Centre (DSC), Kalaburagi
Renovation of Plumbing and Sanitary Works for the Gallery Visitor Toilet and Guest House Rooms at District Science Centre (DSC), Kalaburagi- (For details refer NIT- BoQ. The bill will be paid as per actual detailed measurement) (1 Works)
Repairing and Renovation of STP area at Gangarampur Super Speciality Hospital at Dakshin Dinajpur, West Bengal in the FY 2025-26
REPAIRING & RENOVATION OF STP AREA AT GANGARAMPUR SUPER SPECIALITY HOSPITAL AT DAKSHIN DINAJPUR, WEST BENGAL IN THE FY 2025-26 (refer detailed BOQ 1)
Renovation of Toilets at Durga nagar Main road, Malima veedhi , Jain housing and Thiruneermalai Burial Bround in Zone No.01 TCMC
Construction of inspection chamber of size 60 cm x 60 cm x 60 cm with 75mm thick RCC loose slabs covering in C.M. 1:2:4 mix including necessary reinforcement and earth work excavation for foundation wth 23 cm thick concrete bed using 40mm B.J. concrete in CC ...