Loading…
Loading…
93,620 results • Best match
Civil Repair works at Shahid Jawan Abdul Hamid Park WIT in GN Ward
eProcurement System Government of Maharashtra Created By: ranjit nalage Created Date/Time: 28-Nov-2025 05:51 PM Tender Title: Civil Repair works at Shahid Jawan Abdul Hamid Park WIT in GN Ward Tender ID: 2025_MCGM_1249912_1
Construction of control room building, Boundary wall, water supply arrangement and other civil works at 33 KV S/S Dabak (Sikri)
P-2.1.2: Const. of tubewell from ground level & upto 100 mtr. Depth to accommodate housing and assembly pipe in all type of alluvium strata unconsolidated formations such as pebbles boulders etc. by percussion/ rotary drilling method as per IS: 2800 part 1: 1991 and IS: 2800 part 2: 1979 (both amended upto date) and technical specifications,with gravel as per IS :4097-1967 and it's packing as per IS:2800 (Part I&ll) 1979 as amended upto date (the work includes the cost of gravel & it"s primary packing and packing during development,lowering of housing & strainer assembly pipes with supply and wrapping of coir-rope, wherever necessary for arresting fine sand particals and development work, but excluding the cost of housing and stainer pipe assembly). The work would be compeled after obtaining sand free water. nominal bore 200 mm dia.
Construction of Extension Control Room Building and allied Civil Works at Baidyapur 33/11 KV Sub-Station under Kalna (D) Division.
b)Earth work in filling in foundation trenches or plinth with good earth in layers not exceeding 150 mm including watering and ramming etc layer by layer complete (Payment to be made on the basis of measurement of finished quantity of work) i)With earth obtained from exavation of foundation.
Civil repair works at Tiruthuraipoondi PO under Pattukottai Division
Special Repair Renovation of room no 29 at 4th floor and room no 9 at 8th floor of NIC in Punjab Civil Secretariat 1 Chandigarh CIVIL Works
Dismantling of floor tiles at any floor of the building, laid in cement mortar including dismantling of cement concrete base and disposal of malba at a suitable place within a distance of 100 Mtrs of the complex complete in all respect.
Annual Plan-EDACHERY GP 2025-26 CONSTRUCTION OF EDACHERY PANCHAYATH OFFICE BUILDING -PROJ NO 99/26-General Civil Work
10.25.2:Item Shifted to Sub head 14 as item 14.73 Item Shifted to head 14 as item 14.74 Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works