Loading…
Loading…
461 results • Best match
Supervision Consultancy Services for construction of Dinhata Balarampur Chilakhana Road From 0.00 km to 20.00 km etc.. etc..
Supervision Consultancy Service for the work of :- Dinhata Balarampur Chilakhana Road, From 0.00 km to 20.00 km, Widening (From Carriageway 5.50 m to 7.00 m) & Strengthening works including Construction of 5 Nos. of CD Structures, 4580 m Protection Work & 3170 m Drainage work under Cooch Behar Highway Division in the district of Cooch Behar under RIDF - XXXI., Project ID PD252647843S000. I) REMUNERATION FOR LOCAL PROFESSIONAL STAFF A: Key Personnel Team Leader + Highway Engineer + Road safety expert – 1 No.
Consultancy services for preparation of DPR for Construction of 4-lane Rishikesh Bypass PKG-2 from Design Chainage 542.420 Near Kharasrote Bridge to Design Chainage 548.820 Near Brahmpuri in the State of Uttarakhand Inchuding 02 Tunnels.
Consultancy Services for pre. of (DPR) for Widening 4LPS fromBahraich head Qtr. at Km.263.000 to Sanai Chauraha atkm433.000,Maharajganj to kaptanganj Km.505.000 toKm.537.000 and Kaptanganj to Padrauna Km.537.00to564.00ofNH730 in the State ofUP.
Shortlisting and Ranking of Consultants for preparation of DPR Tender Document for Roads and Bridges to be proposed under MDoNER projects
Providing Consultancy Services for Preperation of DPR and Drawings for Construction of Bridge across the Sharavati River Near to Kudrigi Hanging Bridge in Honavar Taluk Uttarakannada District Under 5054-80-190-0-01-132 KRDCL During 2026-27.
Providing Consultancy Services for Preperation of DPR and Drawings for Construction of Bridge across the Sharavati River Near to Kudrigi Hanging Bridge in Honavar Taluk Uttarakannada District Under 5054-80-190-0-01-132 KRDCL During 2026-27.
Providing consultancy services for Development of Integrated fisheries dockyard at Mayabunder
(a) Site visit and affirmation of techno economic feasibility report of central institute of coastal engineering for fishery, Bangalore (b) conducting all type of investigation, survey and studies essential for preliminary estimation and design © (c) Design of various component and submission of DPR (d) (a) Preparation of BOQ NIT and detailed estimates and tendering on EPC mode (e) (a). To supervise construction work during execution and quality control (f) (a). Training for operation and maintenance preparation of various guidelines for operation, maintenance and safety guidelines of project. (g) (b). Monitoring of operation and maintenance of work for 4 years.