Loading…
Loading…
4,802 results • Best match
Deposit work Palakkad Municipality in ward 47 at Pallipuram school side road Laying pipe line and shifting existing house connection to newly laid line
OD190370/2025-2026:Shifting 15mm (1/2 inch) house connection with 15mm (1/2 inch) water meter from existing AC / GI mains up to 125 mm dia., up to a length of 5 m using 20mm Indian Standard Class 6 uPVC pipe and uPVC / GM / Brass specials viz. brass ferrule, Elbow, MTA, FTA, couplers, GI / MS / SS Service Saddle of suitable size etc. and connecting with the mains, testing the joints etc. complete including trenching and refilling in all kinds of soil up to a depth of 1.50m for main line tracing and trench of average cross section 0.3m x 0.75m for laying connection pipe and service pipe, fixing water meter, lighting, watching, providing caution boards, traffic control etc. complete including cost of materials, hire for tools, cost of consumables and labour charges but excluding cost of water meter and meter box and excluding charges for cutting the concrete / tarred / bituminous roads etc, and as per the direction of the departmental officers.
Cleaning of road gullies Sector-18 Panipat.
Cleaning of road gullies, Operation and mtc. of Storm Water Drainage System before rainy season and during rainy season, blockage of storm water lines, disposal of storm water in HSVP Sector U/E Panipat and all other works contingent thereto with the complete satisfaction of the Engineer-In-Charge including arrangement of safety equipment, TandP which shall be arrangement by contractor at his own cost.
M/o Sewerage (Replacement of Old and Chocked Deep Sewer Line 300 mm, 400 mm dia Sewer Line in Network D-1 to D-10 Sector-03, A-10 to A-83 Sector-2, A-10 to E-1 Sector-01, E-3 to E-30 in Sector-01 and A-51 to Metro Station Sector-15) Noida.
Cutting road and making good the same i/c supply of extra quantities of materials i.e. aggregate, moorum screening, red bajri and labour required of water wound macadam.
Construction of 0.80 MLD Capacity Sewerage Treatment Plant (STP) with Moving Bed Biofilm Reactor (MBBR) Technlogy for 2BHK Housing Project at Kurmalguda in Sy No.50/18 and 80/5 of Balapur (M) of Maheshwaram Constituency including 3 months trial run and 9 months operation and maintainance Charges including Energy Consumption charges / Power Bills payable to TSSPDCL
Ward No. 05, Pikaura Shivgulam Construction of a drainage channel from the area behind Crescent Mall starting from Agyarams house up to Ramendra Sighs house and upgrading and improvement work on the interlocking road from Sarvesh Yadavs house through
Ward No. 05, Pikaura Shivgulam Construction of a drainage channel from the area behind Crescent Mall starting from Agyarams house up to Ramendra Sighs house and upgrading and improvement work on the interlocking road from Sarvesh Yadavs house through Brijbhan Chaudharys and Savitri Mishra houses up to Ramendra Sighs house.
Construction of a road and double-sided drainage (two way drains) from the front of Satish Giddahanumappa house to Jamalsab Kukanoor house near Yaligar Plot And Development work of the Laliveera Yodha Shankrayya Hiremath Park At Ward No 21.
Construction of a road and double-sided drainage (two way drains) from the front of Satish Giddahanumappa house to Jamalsab Kukanoor house near Yaligar Plot And Development work of the Laliveera Yodha Shankrayya Hiremath Park At Ward No 21.