Loading…
Loading…
4,754 results • Best match
Detail Survey, Investigation and Preparation of a DPR under DBO contract model for Upgradation and ACMC of Sewage Treatment Plants at Adampool, Sichey, Jalipool, Syari and Tathangchen.
Providing and laying of 450mm dia RCC NP3 sewer line from Anand Shop gali no 6 to Gandhi nagar Booster Corner ,ward 28,Div-2B under MCG
DIVERSION OF SEWERAGE DISCHARGE INCLUDING PROVISION OF SUBMERSIBLE PUMP SET, GENSET WITH DIESEL OF REQUIRED CAPACITY AS PER SITE WITH OPERATOR, CHOWKIDAR ALL MATERIAL AND MANPOWER REQUIRED. 1208
Attending and rectifying blockages in Rajbavan Assembly Constituency. Maintenance of Sewage Collection System, Puducherry for the period of 12 months from May 2026 to April 2027.
Attending and rectifying blockages in the existing urban sewerage system and sewer lines of Puducherry town and fringes areas covered between J.N. street towards North upto S.V.Patel Salai, Zamindhar Garden, Chinnayapuram, Kuruchikuppam, Vaithikuppam, Vazhaikulam, Ganesh Nagar, Ramalingam Nagar, Vengadasalam nagar, Iyyanaar koil medu, Tsunami Quarters North & South (Gnanaeswarar Nagar), White Town, Kumaragurupallam and adjoining areas covered / located in Rajbavan Assembly Constituency. Maintenance of Sewage Collection System, Puducherry for the period of 12 months from May 2026 to April 2027.
Attending and rectifying blockages in Muthialpet Assembly Constituency. Maintenance of sewage collection system, Puducherry for the period 12 months from May 2026 to April 2027.
Attending and rectifying blockages in the existing urban sewerage system and sewer lines at Muthialpet, VOC Nagar, Ramakrishna Nagar, T.V.Nagar, M.S. Agraharam, Rangavilas Thottom, Ganapathy Nagar, Viswanathan Nagar, Ambalavanar Nagar, Angalamman Nagar, Saint Simonpet, Debasanpet, Manickamudaliyar Thottom, Solai Nagar, Tsunami Quraters North (Ganesh Nagar), Dhanalakshmi Garden, Aravindar Garden, Sapthagiri Garden, and Kalapet Tsunami quarters and adjoining areas covered / located in Muthialpet Assembly Constituency. Maintenance of sewage collection system, Puducherry for the period 12 months from May 2026 to April 2027.
Attending and rectifying blockages in Uppalam Assembly Constituency for maintenance of sewage Collection System in Puducherry for the period of 12 months from May 2026 to April 2027.
Attending and rectifying blockages in the existing urban sewerage system and Sewer lines of Puducherry Town and fringes areas bounded and covered between Lal Bahadur Sasthri street on North, Subbiah Salai on South, Ambour Salai on East and Botanical garden on west, Colas Nagar, Vambakeerapalalyam, Dubrayapet and adjoining areas covered/located in Uppalam Assembly Constituency for maintenance of sewage Collection System in Puducherry for the period of 12 months from May 2026 to April 2027.
Construction of 400 Bedded boys Hostel Building at JIPMER Campus, Puducherr.(Civil Work): Building Portion including internal water supply lines, Sanitary Installation. drainage, demolition of existing quarters & other development works. (Electrical ... Solar Water Heater, ...