Loading…
Loading…
4,792 results • Best match
Estimate for relining/lining of watercourse of outlet RD 74494/R of 2L Minor
Sewerage and drainage
Estimate for relining/lining of watercourse of outlet RD of 8767/R Dodadisty
Sewerage and drainage
Providing 90mm-dia PVC pipe line at Vellamanal area near Pampoori vaikkal at Ward No.1 in Colachel Municipality.
Earth work excavation and depositing on bank with initial lead of 10m and lift of 2m in narrow trenches having bed width 1.25m & below for laying of pipes for water supply and sewerage works in the following type of soils as directed by Departmental Officers.
Installing sewer line near redtape showroom to government school in village harsaru ward no 2 div 1 MCM
Analysis of rate for Providing and fixing of RCC NP-3 600mm i/d pipe through trenchless technology from 1100mm i/d MS casing pipe including pushing, safety equipment , diversion of sewerage and material complete in all respect at sectors 40 cyber park
Attending and rectifying blockages in Nellithope Assembly Constituency. Maintenance of sewage collection system, Puducherry for the period 12 months from May 2026 to April 2027.
Attending and rectifying blockages in the existing urban sewerage system and sewer lines at area bounded by Market street on North, Lourdusamy street on South, Anthony street on West, Pallivasal street on East, and Kosapalayam bounded by East of Lenin street, from Manimegalai School upto Saram Market, North of Thiruvalluvar Salai, South of Kamarajar Salai, and Anandhamuthumaariammankoil on East, Pillaithottom, Saram Market areas and adjoining areas covered / located in Nellithope Assembly Constituency. Maintenance of sewage collection system, Puducherry for the period 12 months from May 2026 to April 2027.
Attending and rectifying blockages in Kamarajar Nagar Assembly Constituency, Maintenance of Sewage Collection System, Puducherry for the period of 12 months from May 2026 to April 2027.
Attending and rectifying blockages in the existing urban sewerage system on North of Kamaraj Salai, Kamaraj Nagar, Venkata Nagar, Chellan Nagar, Rajarajeswari Nagar, Rainbow Nagar including its extension, Jagaraj Nagar, Vasantham Nagar, Senthamarai Nagar, Chettikulam, Thirumudi Seduraman Nagar, Balaji Nagar, Muthurangachetty Nagar, Suntharamoorthy Nagar, Kavikuil Nagar, SuthandiraPonvizha Nagar, East and West Brindhavan, Sithankudi, Gnanapragasam Nagar, Old Saram and adjoining areas covered / located in Kamarajar Nagar Assembly Constituency, Maintenance of Sewage Collection System, Puducherry for the period of 12 months from May 2026 to April 2027.