Loading…
Loading…
4,768 results • Best match
Planning, Design, Construction, Testing and commissioning, certification, validation of Biosafety Level-3 (BSL-3) Laboratory (G plus 1 floor) in EPC Mode-I under PM-ABHIM for National Centre for Disease Control (NCDC) at KIMS, Hubballi, Karnataka ... drains, water supply ... terrace water tank, ... tank, water supply ... lines, storm water ... storm water drains, ... External Sewerage system, ...
Extension of Pipeline at Manthangudi in Perungondanviduthy Panchayat
Earth work excavation and depositing on bank with initial lead of 10 m and lift of 2 M in narrow trenches having bed width 1.25m & below for aying of pipes for water supply and sewerage works in the following type of soils as directed by Departmental officer Hard stiff clay, stiff black cotton, hard red earth, shales,murram gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil.SS20B
Providing laying cutting testing of Sewer RCC Np 3 with HDPE lining and Rising main D I K 9 pipe const M H Chamber Hatch box MPS and Survey Design Supply and Soil Testing Const Inst Comm of 20 MLD STP cum 60 KLD FSTP including O and M Gurdaspur
Survey, Design, Supply & Soil Testing Construction, Installation, Commissioning of 20.00 MLD Sewerage Treatment Plant Cum (60.0 KLD) FSTP respectively based on any suitable sustainable & proven biological technology works including O & M sixty months only for STP & FSTP after stabilization period of 3 months or more at Town & Distt. Gurdaspur. (SBM 2.0 Scheme).
ARC for the work of Providing services for hygienic cleaning and proper sanitation in PTPS Colony, Panipat
Proper cleaning of internal sewerage system i.e. floor traps, gully traps, water closet, urinals and inspection chamber etc. (on day to day complaint basis) in residential and Non-Residential buildings and proper cleaning of mains and sub main of sewerage system and its manhole i/c. removal of chockage, silt etc. in residential and non- residential buildings and proper cleaning of mains and sub main of storm water system, cleaning of gulley chambers, manholes and removing of chocking etc. of existing storm water line in PTPS Colony including all T and P and consumables etc. (To be attended as per complaints received and as per Directions of Engineer In-charge).
Cleaning SWD manhole complete including disposal of malba within 5 km lead complete in all respect as per satisfaction of EIC at Sector 30, Pinjore (A/mtc of PH services in Sector 23 to 28, 31 and 32 and sector 1 to 6, MDC, Panchkula)
Cleaning of sewerage / SWD manhole, including labour, extracting silt / mud and disposal of malba up to 5 km lead as desired by Engineer-in-charge
Cleaning SWD manhole complete including disposal of malba within 5 km lead complete in all respect as per satisfaction of EIC at Sector 29/30, Pinjore (A/mtc of PH services in Sector 23 to 28, 31 and 32 and sector 1 to 6, MDC, Panchkula)
Cleaning of sewerage / SWD manholes including labour, extracting silt / mud and disposal of malba upto 5 Km lead as desired by Engineer-in-charge.