Loading…
Loading…
5,040 results • Best match
Traffic survey, Details Soil investigation, topographical survey an Preparation of Detailed Project Report (DPR) for Strengthening of Illambazar Bansanka Road from 0.00 to 7.50 km, under Birbhum Highway Division No-II, in the district of Birbhum
Traffic survey, Details Soil investigation, topographical survey & Preparation of Detailed Project Report (DPR) for Strengthening of Illambazar Bansanka Road from 0.00 to 7.50 km, under Birbhum Highway Division No-II, in the district of Birbhum in the year 2026-2027. Scope of work- 1.Conducting 7 days- 24 hours (24 x 7) traffic survey by ATCC at 01 location. 2.Details Soil investigation (Test must be done from NABL accreditation Lab). 3. Conducting topographical survey . 4. Conducting Axle load survey at 01 location. 5.Assessment of existing pavement layers of the road by making pits of suitable dimension @ 2 nos/ KM (zigzag way) . 7.Making still and video photographs of the road showing the present condition of the road . 8.Conducting condition survey of all existing cross drainage structures with Photography . 9.Carrying out pavement design as per relevant IRC codes . 10.Preparation of detailed estimate . 11.Submission of complete DPR along with along with relevent data of the proposed work in 6( six) copies (Both Hard & Soft) and PPT also .
Desludging clay/sand/silt from lagoon no. 2 of Mathurapur WTP of Manikchak Dev. Block under Malda Arsenic Area W/S Division PHE Dte.
Earth work in excavation in the canals/drainage channels/borrow pits/River bed//slope of banks as noted below as per desiged section &throwing the spoils in layers of 25 cm for making banks as per profile or to deposite the same in any other place within an initial lead of 30 mtr and initial liftof 1.5 metre including breaking clods,roughdressing etc. complete as per direction of the Engineer in charge.(a)Ordinary soil/local sand/soil mixed with moorum kankar/silt,dry or moist/slushy silt /sticky soil.
Desludging clay/sand/silt from lagoon no. 1 of Mathurapur WTP of Manikchak Dev. Block under Malda Arsenic Area W/S Division PHE Dte.
Earth work in excavation in the canals/drainage channels/borrow pits/River bed//slope of banks as noted below as per desiged section &throwing the spoils in layers of 25 cm for making banks as per profile or to deposite the same in any other place within an initial lead of 30 mtr and initial liftof 1.5 metre including breaking clods,roughdressing etc. complete as per direction of the Engineer in charge.(a)Ordinary soil/local sand/soil mixed with moorum kankar/silt,dry or moist/slushy silt /sticky soil.
CONSULTANCY SERVICES FOR PREPARATION OF DPR FOR EXECUTION OTHER THAN OPERATIONAL WORKS AT AGATTI UT OF LAKSHADWEEP
(vi) Detailed external services design and layouts (a) External electric supply (b) Solar power Generation (c) External water supply (d) Road path (e) Area drainage (f) Sewage disposal (g) Fencing (h) Special Services such as Fire fighting and external fire hydrant, central AC plant, cooling & heating appliances etc. (j) Arboriculture (k) Wind energy (l) Street lights (m) Lightning protection (vii) Detail estimates (viii) Preparation of tender documents
Estimate for Cleaning weed jala booti sarkanda etc Chak Sohele Wala Drain in between RD 0 13000
Estimate for Annual Repair and Maintenance of 6 No. Lift schemes (of village Husner, New Babanian, Manianwala, New Manianwala, Kothe Surgapuri and Gilzewala), 3 No Sub Surface Schemes (of village Ratta Khera, Midda and Husner) and 21 No. Shallow Tube