Loading…
Loading…
4,895 results • Best match
Augmentation of 66kV substation Partap Steel from (2x 12.5/16) MVA to (1x25/31 .5 plus 1x 12.5/16) MVA, 66/11 kV T/Fs atong with replacement of existing 11kV Panel Set with new matching capacity 11kV panel set
Dismantlement of 12.5/16MVA T/F( includes Dismantlement of jumpers,removal of earthing,Dismantlement of OLTC, RTCC Panels and its Cables,accessories,Removal of T/F from Plinth,Removal of Cables,Drainage of oil) complete in all respect.
NCB 2C02 Design and Construction of Twin Tunnel by Shield TBM Cut and Cover Tunnel box Underground ramp and two Underground stations namely Sanganer PS and Jaipur Airport ..... As per NIT
Contract NCB:2C-02: “Design and Construction of Twin Tunnel by Shield TBM, Cut & Cover Tunnel Box, Underground Ramp and Two Underground Stations Namely Sanganer PS and Jaipur Airport with Entry/Exits including Architectural Finishing, Water Supply, Sanitary Installation & Drainage Works from Chainage 11400.000 Mt to Chainage 14528.263 Mt of Prahladpura to Todi MOD North South Corridor of Phase-II of Jaipur Metro Project”.
Provisions for clearing jungle, drain cleaning,earthendrain, tree cutting,replacing damaged cover slabs etc are included in this estimate.
OD1939/2026-2027:Man mazdoor engaged for cutting down overhanging branches of trees and diverting accumulated water along berm clearing choked up drainage spout
Renovation of Cross Drain and vertical drain of Hathmati and Indrasi Dam of Hathmati Reservoir Project
3 for proper drainage arrangement including disposing off the 4034.00 Rmt 1051.00
Interception and Diversion for tapping nallah and setup of sewage treatment plant for Used Water Management of Barela Town
Interception & Diversion of Nallahs with STP works Project of Chachoda-binaganj town under SBM 2.0 1. Design and build sewage treatment plant of installed capacity1.0 MLD and all appurtenant structures and allied works; 2. Survey, review the designs, redesign where necessary, and diversion works of Nallahs with interception sewer of about 1.835 Km length of 450 mm RCC NP3 pipe including survey, design, construction and all appurtenant structures and allied works. 3. Canal Lining Work in Existing Nallah length-90m. 4. Construction of 1 I & D Structure. 5. Arrangement for Reuse of Treated Wastewater from STP 6. Providing and laying of 1 Km HT Feeder Connection & Substation for Sewerage Treatment Plant/ Pumping Station.
Construction of a New Diversion-cum- Sediment Bypass Tunnel for Restoration of Concrete Dam Construction Sluices and Sediment Management of Salal Reservoir
Water Supply & Sewerage