Loading…
Loading…
4,923 results • Best match
ConstructionofFlyOverBridgeatSilverstarJunctioninChandlodiya,AhmedabadMunicipalCorporation,AhmedabadonEPCBasis.(Design,Engineering,ProcurementandConstruction)
pavements, Streetlights, Laying of water supply/drainage/storm water
FIXING/ REPLACEMENT OF MANHOLE and CATCH PIT COVERS INCLUDING REPAIRING WORKS ALONG EM BYPASS FROM RUBI TO CALCUTTA INTERNATIONAL SCHOOL IN WARD NO. 107 and 108
SANITARY AND DRAINAGE WORKS (B)-(IV)INSPECTION PIT,SEPTIC TANK,SOAK PIT ETC.8.Supplying, fitting and fixing in position reinforced cement polymer concrete manhole /gully pit cover with matching frame.As per I.S-12592(M.D) (i) 35 MT load bearing capacity round manhole cover provided with two lifter hooks fitted with matching frame of size.Cover: 700 mm X 100 mm Frame: 910 mm X 185 mm opening: 560mm Weight: 245 kg (approx)
DESILTING OF STORM WATER BOX DRAIN AND REPAIRING OF DAMAGED MANHOL ETC. FROM RABINDRA PALLY TO NEAR BAGHAJATIN RAIL GATE, WARD NO.- 101, UNDER BR. XII
SANITARY AND DRAINAGE WORKS (B)-(IV)INSPECTION PIT,SEPTIC TANK,SOAK PIT ETC.8.Supplying, fitting and fixing in position reinforced cement polymer concrete manhole /gully pit cover with matching frame.As per I.S-12592(M.D) (i) 35 MT load bearing capacity round manhole cover provided with two lifter hooks fitted with matching frame of size.Cover: 700 mm X 100 mm Frame: 910 mm X 185 mm opening: 560mm Weight: 245 kg (approx)
Construction of RCC Open Trough from RD 1.698 to 1.083 KM
[18.40]Supplying and laying of drainage composite for use behind walls, between two different fills, alongside drains of road, below concrete lining of canals etc. Geocomposite for planar drainage, realized by thermo bonding a draining core in extruded monofilaments with two filtering nonwoven geotextile that may also be working as separation or protecting layers. The draining three dimensional core will have a “W” configuration as longitudinal parallel channels. Minimum thickness to be 7.2mm, with two filtering UV stabilized polypropylene nonwoven geotextile of minimum thickness of 0.75mm characteristic opening size (O90) of 110 micron and tensile strength of 8.0 kN/m that will be working as separation or protecting layer, Geocomposite having in plane flow capacity of 2.1 L / (m.s) at hydraulic gradient of 1.0 and 20 kPa pressure and tensile strength of 18 kN/m , with mass per unit area of 740 gsm, supplied in the form of roll for easy transportation to site of work as per detailed specification all complete as per directions of Engineer in charge. [Through Rate]
Road restoration work for BSES road cutting ,A-C,C-E Road Restoration work for 33 KV Infeeds to CPWD Kasturba Nagar by LILO of 33 Ckt from 220KV Lodhi Road DTL to Kushak Nallah (ES24GS4021), New Delhi, under Division SER-1, Sub-Division SER-14...
Laying at or near ground level old kerb stones of all types in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement : 3 coarse sand), including making joints with or without grooves (thickness of joints, except at sharp curve, shall not be more than 5 mm), including making drainage opening wherever required etc. complete as per direction of Engineer -in-charge. (Length of finished kerb edging shall be measured for payment). (Old kerb stones shall be supplied by the department free of cost).
CONSTRUCTION OF SUBMERSIBLE BRIDGE AT BORAMCHA (TIROL) OVER BANAS RIVER
Drainage spouts complete as per drawing and MoRTH specifications Clause 2705