Loading…
Loading…
4,923 results • Best match
Construction of flood protection wall to the bank of nallah in Sy. No. 816/1 at Latambarcem village in Bicholim Constituency
Providing weep holes of clear size 63mm dia pipe in concrete as per drawing and direction of Engineer in charge with 63mm dia PVC pipe of 6kg pressure (II nd class) and keeping the same in position with a slope of about 1 vert to 20 horz towards drainage face while laying the concrete complete
Temporary Protection work by Nylon crates with Gunny Bags at embankment side of Pachundi Uddharanpur Road at Ch. 6.20km under Burdwan North Highway Division in the district of Purba Bardhaman during the year 2026-27.
Earthwork in excavation in the canals / drainage channels / borrow pits / River bed / slope of bank as noted below as per designed section & throwing the spoils in layers of 25 cm. for making banks as per profile or to deposit the same in any other place within an initial lead of 30 metre and initial lift of 1.5 metre including breaking clods, rough dressing etc. complete as per direction of the Engineer-in-charge. (a) Ordinary soil / local soil / soil mixed with moorum or kankar / silt, dry or moist / slushy silt / sticky soil.
Landscape Development at New Auditorium Building Saurashtra University, Rajkot
make for drainage system pipe line, pipe shale jointed with
Construction / Upgradation of Rural Roads under Pradhan Mantri Gram Sadak Yojna including maintenance for Five Year after construction-PMJANMAN
Setting out work completed with construction of reference benchmark/working benchmark (minimum 5per Km ), made of concrete M-10 of size 575x575x450mm with a base of size 900x900x100mm including white washing, marking of chainage, Levels etc.(As per drawing Annex-I) and reference pillars made of cut stone having minimun thickness 65 mm / precast concrete poles/concrete (M-10) filled AC pipes @ 100 m interval embaded in concrete base of M-10 of size 300x300x750mm on both sides of the formation width, marking on centre line setting out curves and recording of central line levels and other required levels and distances etc. including setting out of Cross Drainage structures with required reference pillers and marking etc. as directed by Engineer-in-Charge. The setting out work will be maintaind by the contractor till the completion of work.
8.Construction work of drain and ditch from Saidapur link road to Ishwar Dayals house in Mo. Tajpur.
Cleaning of drainage up to silt at site with disposal of 60mtr. including waste making diversion etc....all comp.
11.Construction work of interlock road and drain from Durvesh Sharma plot to Baburam house and from Rajesh Guptas house to Nanhe Mistris house in Mo. Ramnagar Colony.
Cleaning of drainage up to silt at site with disposal of 60mtr. including waste making diversion etc....all comp.