Loading…
Loading…
4,966 results • Best match
Constructing Gated S.B. Juna Chandsurya (Fattepur Shivar Choblyapada) Ta. Shirpur
ITEM NO. 2 Providing and fixing steel anchor (25 mm dia) with resin bond cement capsule anchorage including drilling holes, inserting grout capsule driving anchor, cost of all material, machinary, labour, ventilation, lighting, drainage and other ancillary operations etc. complete with lead upto 1 Km and all lifts.
Construction of Bridge to Manikya Halla at Avinahalli Village in Sagara taluk Shimogga district
Drainage Spouts using 100 mm GI pipe complete as per drawing and Technical specification complete with all lead and lift and as directed by the Engineer-in-charge.
Providing CC Drain, CC Road, 110mm dia HDPE and UGD Line at Yadava Bazar 1/2 line in Div.No.09 under AE-13 Section.
Manufacture, Supply, & Delivery of Unplasticised Non-pressure polyvinyl chloride(PVC-U) pipes of dark (any shade of brown) for use in underground drainage & sewerage system conforming to IS 15328/2003) with solvent cement jointing as per specification inclusive of transportation to the sub-divisional stores anywhere in A.P, excluding all taxes
CONSTRUCTION OF PERCOLATING WELL AT VARIOUS - 21 LOCATION IN DEESA NAGARPALIKA AREA, DEESA, DIST:BANASKANTHA. (II Attempt)
Excavation for pipe line treanches for water supply , sewerage
ENGINEERING PROCUREMENT AND CONSTRUCTION (EPC) FOR AUGMENTATION OF SEWAGE TREATMENT WORK SYSTEM AT CME KHADKI
Manning and Operation for maintain and cleaning of entire sewerage network connected to the STP including manholes, inspection chambers, sewer lines, and pumping stations; desilting, flushing, safe disposal of sludge/silt at specified locations; maintaining proper flow and hygiene of Sewage Treatment Plants with two shifts of 8 Hours per day including Sunday & Holiday by employing one Sewage maintenance worker for 05 years (including 02 years of Defects liability period) after completion of mile stone 2 complete all as specified in Particular Specifications and as directed by the Engineer-in-Charge complete all as specified and directed.
Day to Day repair/ maintenance in Govt. Qtr. At Company Bagh and Roller shed upto ending March 2027. CNO-70 NP
providing &fixing of PVC Pipes for drainage ,severage,rain water flow pipe etc including labour &material costs complete job in all heights(LMR) 4' dia