Loading…
Loading…
5,116 results • Best match
SPL REPAIR TO FOOTPATH AND HARDSTANDING IN MANEKSHAW GROUND AT DANAPUR CANTT
M & L Providing and laying at or near ground level factory made kerb stone of M-25 grade cement concrete in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5 mm), including making drainage opening wherever required complete all as specified and directed.
Construction of PCC Road From House of Sri Ratan Kachhap to Arasah main Road at vill- Kinni, G.P.- Labga, Block- Patratu, Dist-Ramgarh.
Dry Rubble Flooring. (Construction of dry rubble flooring at cross drainage works for relatively less important works.) Vide RCD SOR item no. 16.09
Construction of PCC Road From Sanjay Mishra House via Sukhlal Turi to Ramu bangali House at Bhurkunda Hospital colony, G.P.- Bhurkunda, Block-Patratu, Dist-Ramgarh
Dry Rubble Flooring. (Construction of dry rubble flooring at cross drainage works for relatively less important works.) Vide RCD SOR item no. 16.09
PROVISION OF STP FOR AVA HILL COMPLEX AND MANDIR LINE COMPLEX AT WELLINGTON UNDER GE WELLINGTON
Note for Sch. Item No 25,26,27 &28 (a) Operating Pump sets of any capacity as directed (b) Checking sewage level in the STP. (c) Maintaining Log Book for STP (e) Maintaining record of timing of STP operation (f) Operating Sluice/Gate Valves located within 1 KM from the STP for Supply of treated water to garden/MT vehicle washing as per the time schedule/requirement. (g) Routine maintenance & cleaning/back washing of filteration plant. (h) Carrying out necessary measure to achieve parameters of STP treated water as per Standards for Discharge of STP should be are as follows:- (a) pH 6.5 - 8.5 (b) COD 30 mg/L (c) BOD 10 mg/L (d) TSS 10 mg/L (e) Total Nitrogen 10 mg/L (f) Total Phosphorus 1 mg/L (g) Fecal Coliform Nil (h) Odour No foul odour and latest as per latest CPHEEO Manual for Sewerage and Sewage Disposal (j) Operation of DG Set etc (k) Inspect equalization tank/entry to system for blockages, plastics etc and remove. (m) Inspect aerator and note biomass growth, recirculation and any malodour. (n) Grease for all bearings. (o) Drain gearbox oil and replace Also check holding plate bolts. (p) Check shaft for wear and alignment. (q) Check all bearings for wear and tear, check all bolts for tightness and check chain coupling and check bolts for tightness. (r) Check motor for overheating (by touch) and remove dust etc. from air fins,grease all bearings through nipples,grease all chain couplings through casing nipples, check oil level in gearbox and top up if necessary,check sludge return system from humus tank for function,apply light lubricating oil in small quantities to locks and hinges,preparing & submitting monthly report on performance of the plant
Macadamization of interior Roads of Jawahar Nagar by way of 50mm thick BM, 25mm thick SDBC n 6mm thick seal coat.
P/l of RCC spun pipes for cross drainages incl excavation of trenches upto required depth and jointing of pipes with cement slurry and jute yarn incl. all carriages from departmental store to site of work and providing of proper cushion over the pipe surface complete ( pipes to be laid at different spots) 250mm dia RCC spun pipes incl cost of pipes complete incl dewatering if any.
Restoration of damaged features like road, footpath, drain, chambers etc cut by Delhi Jal Board at Mall Road from Timarpur Red Light to University Road under Sub Division-2 of Division C and ND-R dg. 2026-27.
Making bell mouth opening/ entrance of size 100x50x50 cm for drainage pipe under footpath, including providing cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) for shape of bell mouth, including plastering providing and fixing precast R.C.C./ S.F.R.C. slab including plastering with cement mortar 1:3 (1 cement : 3 fine sand) of 6 mm thickness on exposed surface of the slab & bell mouth including centring, shuttering & neat cement punning inside the bell mouth etc. all complete.