Loading…
Loading…
5,093 results • Best match
GENERAL Methurumba Chapparapadavu Kutoor Road Providing drain and side protection work between KM 15/300 to 15/800 General Civil Work
CROSS DRAINAGE WORKS
Construction of a Bridge at Km 17.50 on the Kadirenahalli Indiranagar Road via Idagur, Kadalaveni, and G. Bommasandra, Gauribidanur Taluk
Drainage Spouts using 100 mm GI pipe complete as per drawing and Technical specification. Ref to MoRT&H : IRC - 2705 ---- including the cost and conveyance of all materials, Curing, cost of labour hir...
Beautification Work of The Palitana City as Per Various Location Chart. At, Palitana. Under Swach and Sundar Shaher Yojana (SSSY-2025-26). (Second Attempt)
5 Near NP Drainage Office, Gariyadhar Road
MAINTENANCE OF INTERNAL ROAD INCLUDING ROAD FURNITURE AND ALLIED ITEMS IN THE AOR OF AGE B/R-I OF GE 865 EWS
Material and labour for providing and laying at or near ground level factory made kerb stone of M-25 grade cement concrete in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not be more than 5 mm), including making drainage opening wherever required including necessary earth work and taking down the old kerb stones, complete all as specified and/or as directed by Engr-in-Charge.
Reconstruction of damaged cement concrete road and development of footpath on Ghitorni village Road (Zero No. Road) under SR-15 / South road-1 New Delhi.
Providing and laying at or near ground level factory made kerb stone of M-25 grade cement concrete in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5mm), including making drainage opening wherever required complete etc. as per direction of Engineer-in-charge (length of finished kerb edging shall be measured to calculate volume for payment). (Precast C.C. kerb stone shall be approved by Engineer-in-charge).
Special Repair of Bridges & Culverts on Various Roads Under Sub Division No-03 Durg (Zonal Agency)
1 4.1 Granular Sub-base as per Table:- 400-1 Construction of granular sub-base by providing graded Material, , carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface watering, rolling and compacting with vibratory power roller at OMC to achieve the desired density, complete as per clause 401 Plant mix method (with Mechanically crushed stone only) (b) For Sub-base cum drainage layer or upper sub-base with (i) Grading-V Material 235.31 370147.00 0.00 235.31 Cum 1573.00 370147.00