Loading…
Loading…
4,870 results • Best match
Construction of Internal road with side drain at SWM Plant.
Providing and laying cross drainage MS pipes as per requirement 200mm dia for disposal of waste ,including cushioning, maintaining of gradient, carriages. complete Job
ESTABLISHMENT OF WASTE DISPOSAL PLANT IN PANAGARH MILITARY STATION
Lumpsum price workedout by the tenderer for AREA DRAINAGE as listed in Schedule ‘A’ Part-IV.
Const. of 3 Nos. RCC Box Culvert size 3/3 2 Cell, 1/1 1 Cell and 1/1 1 Cell at Pokihaga near Bazar to Boroghopa road Kokrajhar District. TN_15_02
13.10 Drainage spouts complete as per drawing and technical specifications Clause 1209
Construction Of Bridge_Approach Road and Protection Work Over River Hindon Between Mataur_Daulcha Border in 57_Modinagar Assembly Constituency in District Ghaziabad
PROVIDING AND FIXING DRAINAGE SPOUTS AS PER DRAWING AND TECHNICAL SPECIFICATIONS
CONSTRUCTION OF KESLI TO SAKARI ROAD(VILLAGE ROAD) LENGTH 3.00 K.M. I/C CULVERT, AT DIST. BALODABAZAR-BHATAPARA(BALODABAZAR DN.)
Granular Sub-base as per Table:- 400-1 Construction of granular sub-base by providing graded Material, , carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface watering, rolling and compacting with vibratory power roller at OMC to achieve the desired density, complete as per clause 401 For Sub-base cum drainage layer or upper sub-base with Grading-V Material
Development of open space for childrens recreational facilities in front of Type-V B-Block at housing complex, AIIMS Bhubaneswar.
Providing and laying at or near ground level factory made kerb stone of M-25 grade cement concrete in position to the required line, level and curvature,jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5mm), including making drainage opening wherever required complete etc. as per direction of Engineer-in-charge (length of finished kerb edging shall be measured for payment). (Precast C.C. kerb stone shall be approved by Engineer-in-charge).