Loading…
Loading…
5,117 results • Best match
Construction of Drainage at B.Mathur Nadutheru Main road in M.Kulavaipatty Panchayat
Construction of Drainage at B.Mathur Nadutheru Main road in M.Kulavaipatty Panchayat
RCC Drainage Kasturba Gamdhi Girls Hostel Bjawan Shivrichands J P Pushprajgarh
RCC Drainage Kasturba Gamdhi Girls Bhawan Shivrichands Janpa Panchyat Pushprajgarh
Construction of Drainage at B.Mathur Keelatheru Main road in M.Kulavaipatty Panchayat
Construction of Drainage at B.Mathur Keelatheru Main road in M.Kulavaipatty Panchayat
Construction of Drainage at Thirupathiyapuram Main Road in Manimuthar Town Panchayat
Earthwork excavation for foundation in all soils and sub soils in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders and to full depth as may be directed,except in hard rock,requiring blasting including shoring and shuttering and bailing out of water wherever necessary,refilling the sides of foundation with excavated earth or sand in layer of not more than 15cm thick.well rammed and consolidated and depositing on bank with initial lead and lift of 10m & initial lift of 2m and depositing the surplusr earth within the compound in places shown by the departmental officers with iniital lead and lifts,clearing and levelling the site etc., complete as per SS20B and as directed by departmental Engineers(TNBP No.17,23,24).
Moonilampadam Vaalakkapadi Puttekkad Road, Drainage Feroke Municipality , Kozhikode District (Recast Estimate )-
DRAINAGE AND ROAD CONSTRUCTION
SH Deployment of labour staff for operation running and maintenance of 0.70 MLD capacity STP including sewerage network system to Arki Town for a period of 18 Months in 2nd Call
Operation and Maintenance of STP Arki 0.7 MLD capacity with Primary Treatment Units having Inlet Chamber,Screens and Grit Channel ,Secondary treatment units (Aeration Basin) and Tertiary Treatment Units (RPSF&ACF) as exists on site with related electromechanical equipments and laboratory in the existing plant Building with a sewerage network of 11.00 KM in and around the Kunihar Town in various dia. of pipes and manholes for a period of three years from the day of taking over of the plant .The rate quoted shall be inclusive of the contractor profit and taxes like GST, Income tax etc and including the cost of getting the effluent samples collected & tested from NABL/HP Govt. recognized third party laboratories. ( Read annexure-A)