Loading…
Loading…
5,142 results • Best match
Improvement Drainage and CC Internal Road in Malali Village of Mudhol Taluk Bagalkote District
Improvement Drainage and CC Internal Road in Malali Village of Mudhol Taluk Bagalkote District
Drainage construction and development of internal roads at the landfill site(Reserved for sc)
Drainage construction and development of internal roads at the landfill site
726/P-1/EMPW-13296 dtd. 17.04.2026 Running and Maintenance of 3 No. Sewerage Treatment Plants at Power Colony and Nuhon Colony, GGSSTP, and Rupnagar.
M/o Sewerage (Shifting of 300 mm dia SPS-16 D. I. Line due to Construction of Elevated Flyover at Shahdara Drain, Sector-16) Noida.
Excavating trenches of required width for pipes, cables etc. i/c excavation for sockets depth upto 1.50 m i/c getting out the excavated materials, returning the soil as required in layers not exceeding 20 cm. in depth i/c consolidating each deposited layer by ramming, watering etc. and disposing of surplus excavated soil as directed, within lead of 50 m. The Contractor has to detect different utilities like sewer line, water supply line, electric cable, telephone cable, gas pipe line etc. using utility detecting machine before start of excavation and shall start excavation only after getting permission of Engineer-in-Charge. Pipes, cables etc. exceeding 300 mm dia but not exceeding 600 mm dia. (DSR-18, I.No.-2.13.1.3/P-75)
Providing and Laying of Sewerage Pipeline and Construction of Machineholes Near house of Mahadevamma and Ellamma thayi slum, Ward No-08 of Mysuru City Corporation.
Providing and Laying of Sewerage Pipeline and Construction of Machineholes Near house of Mahadevamma and Ellamma thayi slum, Ward No-08 of Mysuru City Corporation.
Hiring of 8kl Jetting Cum Suction Machine for Maintenance of Sewerage system for the area Kalkaji Constituency AC-51 under EE (C)-33 (Re-invited).
Engagement of labour for maintenance of sewerage system i/c removal of blockage, cleaning of manholes, removal of silt from manholes to the dumping ground etc. All complete as per direction of Engineer in Charge i/c (2x12x25 days per month).